Dallas Logo
File #: 24-868    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 2/28/2024 In control: Water Utilities Department
On agenda: 5/22/2024 Final action:
Title: Authorize a construction services contract for the installation of storm drainage improvements and water and wastewater main replacements at seven locations (list attached to the Agenda Information Sheet) - SYB Construction Co., Inc., lowest responsible bidder of three - Not to exceed $13,877,982.60 - Financing: Flood Control (D) Fund (2017 General Obligation Bond Fund) ($2,057,403.12), 2024B Certificate of Obligation Fund ($7,474,691.88), Water Capital Improvement G Fund ($2,616,107.60) and Wastewater Capital Improvement F Fund ($1,729,780.00)
Indexes: 2, 5, 6, 7
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Transportation & Infrastructure
AGENDA DATE: May 22, 2024
COUNCIL DISTRICT(S): 2, 5, 6, 7
DEPARTMENT: Water Utilities Department
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

Title
Authorize a construction services contract for the installation of storm drainage improvements and water and wastewater main replacements at seven locations (list attached to the Agenda Information Sheet) - SYB Construction Co., Inc., lowest responsible bidder of three - Not to exceed $13,877,982.60 - Financing: Flood Control (D) Fund (2017 General Obligation Bond Fund) ($2,057,403.12), 2024B Certificate of Obligation Fund ($7,474,691.88), Water Capital Improvement G Fund ($2,616,107.60) and Wastewater Capital Improvement F Fund ($1,729,780.00)

Body
BACKGROUND

This action will authorize a construction services contract with SYB Construction Co., Inc., for storm drainage improvements to address localized flooding issues. The construction contract includes storm drainage and flood management improvements at seven locations, including 9321 Prairie Oak Drive, 4804 Hollow Ridge, Hatfield Branch at Seagoville Channel Improvements, Joe's Creek - W. Fork Bridge at Walnut Hill Lane, 3602 Loganwood, Junius Street at Baylor Medical Center and Abshire Lane. The construction work will consist of channel improvements, removing and replacing existing culverts, removing, and replacing existing storm drainage pipes, and capacity improvements to the existing drainage system.

In addition to storm drainage improvements, the contract will include water and wastewater main replacements at three locations - 9321 Prairie Oak Drive, Junius Street at Baylor Medical Center, and Abshire Lane. The water and wastewater main replacements will address substandard water and wastewater mains in the same project areas as the storm drainage improvements. This includes the installation of approximately 34,170 feet of water and wastewater...