SUBJECT
Title
Authorize a construction services contract for the installation and rehabilitation of water and wastewater mains at 12 locations (list attached to Agenda Information Sheet) - SYB Construction Co., Inc., lowest responsible bidder of three - Not to exceed $17,271,242.00 - Financing: 2023C Water Revenue Bonds TWDB LM231535 Fund ($13,241,118.01), Wastewater Capital Improvement F Fund ($2,361,327.00), Water Capital Improvement G Fund ($1,632,858.00), and Water (Drinking Water) - TWDB 2022 Fund ($35,938.99)
*In alignment with Water and Wastewater Capital Improvement Program.
Body
BACKGROUND
The existing water and wastewater mains were built between 1951 and 1981 and have been identified for replacement or rehabilitation due to their poor condition, service interruptions, and increased maintenance efforts. Some of these mains also need to be upsized to meet future demands. The existing 48-inch diameter water main is being relocated from within Oncor property, adjacent to high voltage electrical infrastructure, to a location within public right-of-way. Relocation of the line will improve reliability and maintenance access for this critical water transmission pipeline. Overall, the installation and rehabilitation of the proposed segments will improve the capacity of the water and wastewater systems, reduce maintenance costs and minimize service interruptions.
The following chart illustrates SYB Construction Co., Inc.’s contractual activities with the City of Dallas for the past three years:
AVI DWU PKR TPW
Projects Completed|9 99 9 10|Active Projects|9 99 9 10|Change Orders|9 99 9 10|Projects Requiring Liquidated Damages|9 9 9 9 10|Projects Completed by Bonding Company|9 9 9 9 10|
This action will authorize a construction servi...
Click here for full text