Title: Authorize a professional services contract with Kimley-Horn and Associates, Inc., to provide engineering services for storm drainage and erosion control improvements at two locations (list attached to the Agenda Information sheet) - Not to exceed $271,832.00 - Financing: 2024 Certificate of Obligation Fund
Indexes: 11, 13, 6
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Transportation & Infrastructure
AGENDA DATE: June 26, 2024
COUNCIL DISTRICT(S): 6, 11
DEPARTMENT: Water Utilities Department
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

Title
Authorize a professional services contract with Kimley-Horn and Associates, Inc., to provide engineering services for storm drainage and erosion control improvements at two locations (list attached to the Agenda Information sheet) - Not to exceed $271,832.00 - Financing: 2024 Certificate of Obligation Fund

Body
BACKGROUND

This action will authorize a professional services contract with Kimley-Horn and Associates, Inc. for the evaluation and design of storm drainage and erosion control improvements at two locations. Engineering evaluations and design improvements will be completed under this contract for streambank stabilization, erosion control and slope protection along the Elm Fork of the Trinity River at the Skyline Trail Bridge / Trinity View Park and storm drainage improvements at 6900 Royal Lane to address known flooding issues attributed to existing inadequate storm drainage infrastructure.

The services provided for this contract include project management, topographic and boundary surveys, easement document preparation, environmental permitting, subsurface utility exploration, geotechnical investigations, structural analysis, drainage studies including hydraulic analysis, and development of conceptual and final construction plans and special specifications.

The consulting firm for this project was selected following a qualifications-based selection process in accordance with City of Dallas Administrative Directive 4-05 procurement guidelines.

ESTIMATED SCHEDULE OF PROJECT

Begin Design July 2024
Complete Design April 2025



PRIOR ACTION/REVIEW (COUNCILS, BOARDS, COMMISSIONS)

This item has no prior action.

FISCAL INFORMATION

Fund
FY 2024
FY 2025
Future Years
2024 Certificate of Obligation ...