Title:
|
Dallas Water Utilities: Authorize a construction services contract for the installation of an 84-inch diameter water transmission main under the Trinity River located between I-45 and SH-310 - Southland Contracting, Inc., lowest responsible bidder of two - Not to exceed $23,877,520.00 - Financing: Water Construction Fund ($23,877,520.00)
|