SUBJECT
Title
Authorize a construction services contract for water and wastewater main installation and rehabilitation improvements at 18 locations (list attached to the Agenda Information Sheet) - Douglas Dailey Construction, LLC, lowest responsible bidder of six - Not to exceed $19,720,451.00 - Financing: Water (Drinking Water) - TWDB 2019 Fund ($4,699,849.28), Water (Drinking Water) - TWDB 2020 Fund ($3,828,587.31), Wastewater Capital Improvement F Fund ($2,725,802.68), Wastewater (Clean Water) - TWDB 2019 Fund ($2,656,922.06), Wastewater (Clean Water) - TWDB 2020 Fund ($2,133,521.64), Wastewater (Clean Water) - TWDB 2021 Fund ($1,834,213.02), Water Capital Improvement G Fund ($1,800,780.00), and Water Capital Improvement F Fund ($40,775.01)
*In alignment with Water and Wastewater Capital Improvement Program.
Body
BACKGROUND
This action will authorize a construction services contract with Douglas Dailey Construction, LLC for the installation and rehabilitation of approximately 30,047 feet of water and wastewater mains at 18 locations. The contract includes the installation of approximately 834 feet of 6-inch; 10,910 feet of 8-inch; 3,130 feet of 12-inch; 1,940 feet of 16-inch; and 23 feet of 36-inch diameter water mains. In addition, the contract includes the installation and rehabilitation of approximately 750 feet of 6-inch; 5,560 feet of 8-inch; 740 feet of 10-inch; 560 feet of 12-inch; 3,700 feet of 16-inch; and 1,900 feet of 30-inch diameter wastewater mains.
The proposed pipeline segments were initially awarded as part of other Dallas Water Utilities Department (DWU) construction contracts for the installation and rehabilitation of water and wastewater main improvements at various locations. However, the c...