Skip to main content
Dallas Logo
File #: 25-3028A    Version: 1 Name:
Type: BRIEFING ITEMS Status: Agenda Ready
File created: 10/14/2025 In control: Transportation and Infrastructure Committee
On agenda: 10/20/2025 Final action:
Title: Department of Transportation and Public Works: Authorize (1) the acceptance of a grant from the U.S. Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Surface Transportation Block Grant (STBG) Program (Agreement No. CSJ 0918-00-472, Assistance Listing No. 20.205) in the amount of $495,000.00 as Federal participation in the total project cost of $520,400.00, which includes $480,150.00 in Federal reimbursement, $14,850.00 as Federal participation for direct state cost, $25,400.00 as State participation for indirect state cost, and the use of 99,000 City of Irving Transportation Development Credits plus any cost overruns as local participation for environmental assessment and mitigation, architectural and engineering, and construction of a right turn/declaration lane to improve safety on Belt Line Road at South Northlake Road in the City of Dallas; (2) the establishment of appr...
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

Department of Transportation and Public Works: Authorize (1) the acceptance of a grant from the U.S. Department of  Transportation  Federal  Highway  Administration  through  the  Texas  Department  of  Transportation  (TxDOT)  for  the  Surface  Transportation  Block  Grant  (STBG)  Program  (Agreement  No.  CSJ  0918-00-472,  Assistance Listing No. 20.205) in the amount of $495,000.00 as Federal  participation in the total project cost of $520,400.00, which includes  $480,150.00 in  Federal  reimbursement,  $14,850.00 as  Federal  participation for direct state cost, $25,400.00 as State participation for  indirect state cost, and the use of 99,000 City of Irving Transportation  Development Credits plus any cost overruns as local participation for  environmental assessment and mitigation, architectural and engineering,  and construction of a right turn/declaration lane to improve safety on Belt  Line Road at South Northlake Road in the City of Dallas;  (2) the  establishment  of  appropriations  in  the  amount  of  $480,150.00 in  the  TxDOT STBG Program - Belt Line at South Northlake Road Fund; (3) the  receipt and deposit of funds in the amount of $480,150.00 in the TxDOT  STBG Program - Belt Line at South Northlake Road Fund; and (4)  execution of the Advance Funding Agreement with TxDOT and all terms,  conditions, and documents required by the agreement - Total amount of  $480,150.00 - Financing: TxDOT STBG Program - Belt Line at South  Northlake Road Fund