File #: 19-1024    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/12/2019 In control: Water Utilities Department
On agenda: 9/11/2019 Final action:
Title: Authorize a professional services contract with JQ Infrastructure, LLC to provide engineering services for the investigation, preliminary design, development of construction plans and specifications, bid phase services, construction administration and start-up associated with Peak Flow Basin D Improvements and Existing Peak Flow Basins Rehabilitation at the Central Wastewater Treatment Plant - Not to exceed $3,430,000.00 - Financing: Wastewater Construction Fund
Sponsors: District 4
Indexes: 4
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Mobility Solutions, Infrastructure, and Sustainability

AGENDA DATE:                     September 11, 2019

COUNCIL DISTRICT(S):                     4

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with JQ Infrastructure, LLC to provide engineering services for the investigation, preliminary design, development of construction plans and specifications, bid phase services, construction administration and start-up associated with Peak Flow Basin D Improvements and Existing Peak Flow Basins Rehabilitation at the Central Wastewater Treatment Plant - Not to exceed $3,430,000.00 - Financing:  Wastewater Construction Fund

 

Body

BACKGROUND

 

The City of Dallas owns and operates two wastewater treatment plants with a combined treatment capacity of 280 million gallons per day.  Central Wastewater Treatment is the largest of the two plants, located just south of downtown.  The Central Wastewater Treatment Plant currently has three peak flow basins that provide storage of raw wastewater entering the plant during high wet weather flows.  Peak flow basins allow these high flows to be stored for brief periods and released at a steady rate to reduce the impact to the treatment process and reduce sanitary sewer overflows.

 

Dallas Water Utilities has identified the need to increase peak flow storage capacity and improve operational flexibility for the management of peak flow operations at the Central Wastewater Treatment Plant.  This contract includes engineering services for the evaluation, design and construction of a new peak flow basin along with the rehabilitation of two existing basins and additional peak flow pumping improvements.  The improvements will increase the total peak flow storage at the treatment plant by 176 million gallons for a total storage volume of 346 million gallons.  The increased storage capacity will help minimize sanitary sewer overflows in the collection system and provide operational flexibility during high flow events, unpredictable equipment failures, and shutdowns required for maintenance activities throughout the plant.  In addition, these improvements will allow the plant to meet increasing wet weather storage requirements as identified in the 2010 Wastewater Treatment Facilities Strategic Plan, extend the service life of existing peak flow storage facilities, and increase operational and maintenance flexibility for peak flow operations.

 

 

 

The consulting firm for this project was selected following a qualifications-based selection process in accordance with City of Dallas Administrative Directive 4-5 procurement guidelines.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                     October 2019

Complete Design                     July 2021

Begin Construction                     September 2021

Complete Construction                     August 2023

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Wastewater Construction Fund - $3,430,000.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Plan adopted on October 22, 2008, by Resolution No. 08-2826, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Category

M/WBE Goal

M/WBE %

M/WBE $

$3,430,000.00

Architectural & Engineering

25.66%

75.16%

$2,577,873.00

This contract exceeds the M/WBE goal.

 

OWNER

 

JQ Infrastructure, LLC

 

Murali Kariyarveedu, President

Steven H. Lucy, Vice President

 

MAP

 

Attached