STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: September 11, 2019
COUNCIL DISTRICT(S):|910|DEPARTMENT: Department of Public Works
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT
Title
Authorize an increase in the construction services contract with Schneider Electric Buildings Americas, Inc., for additional electric equipment necessary for the emergency backup system and to perform an Arc Flash study required by the National Electric Code at Dallas City Hall located at 1500 Marilla Street - Not to exceed $447,626.00, from $2,814,907.00 to $3,262,533.00 - Financing: Facilities (H) Fund (2017 Bond Funds)
Body
BACKGROUND
On October 24, 2018, City Council authorized a construction services contract with Schneider Electric Buildings Americas, Inc., for the removal and replacement of the existing Federal Pacific switchgear and the existing Uninterruptable Power Supply (UPS) system at Dallas City Hall.
On April 17, 2019, Administrative Action No. 19-0053 authorized Change Order No. 1 to the construction services contract with Schneider Electric Buildings Americas, Inc. to include a load breaker to the UPS system to allow for testing and load banking of the UPS system, in an amount not to exceed $43,371.00.
This action will authorize Change Order No. 2 to the construction services contract with Schneider Electric Buildings Americas, Inc. for the unforeseen electrical issues uncovered during the preliminary work completed by the contractor and to perform an Arc Flash study required by the National Electric Code. In addition, this change order will upgrade the electrical system to install two independent power sources from the ONCOR grid system and from the emergency generator system feeding the UPS system at Dallas City Hall, in an amount not to exceed $447,626.00.
ESTIMATED SCHEDULE OF PROJECT
Begin Construction September 2019
Complete Construction March 2020
PR...
Click here for full text