File #: 19-1044    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/18/2019 In control: Water Utilities Department
On agenda: 9/25/2019 Final action:
Title: Authorize a construction contract for the installation of a 72-inch diameter water transmission pipeline along Broadway Street and Madill Railroad corridor from the Elm Fork Water Treatment Plant to Crosby Road - Oscar Renda Contracting, Inc., lowest responsible bidder of three - Not to exceed $43,186,835.00 - Financing: Water Capital Improvement E Fund
Indexes: 200
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: September 25, 2019
COUNCIL DISTRICT(S): Outside City Limits
DEPARTMENT: Water Utilities Department
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

Title
Authorize a construction contract for the installation of a 72-inch diameter water transmission pipeline along Broadway Street and Madill Railroad corridor from the Elm Fork Water Treatment Plant to Crosby Road - Oscar Renda Contracting, Inc., lowest responsible bidder of three - Not to exceed $43,186,835.00 - Financing: Water Capital Improvement E Fund

Body
BACKGROUND

Dallas Water Utilities has plans to install a 72-inch diameter water transmission pipeline between the Elm Fork Water Treatment Plant and the Bachman Water Treatment Plant. The 72-inch pipeline is required to increase system capacity, hydraulic flexibility, and meet system needs as recommended through master planning and long range water supply planning efforts. Portions of the nearly 10-mile long pipeline have been constructed and the southern connection in Harry Hines Boulevard from Cullum Lane to Walnut Hill Lane is currently under construction.

This action will authorize a construction contract with Oscar Renda Contracting, Inc. for the installation of approximately 8,700 feet of a 72-inch diameter water transmission pipeline from the Elm Fork Water Treatment Plant to Crosby Road within the corporate limits of Carrollton. The project will be the first of two phases to complete the northern connection from Farmers Branch to the Elm Fork Water Treatment Plant. A future construction project will install the last section of the pipeline between Farmers Branch and Crosby Road.

The following chart illustrates Oscar Renda Contracting, Inc.'s contractual activities with the City of Dallas for the past three years:

PBW DWU PKR

Projects Completed|99910|Change Orders|99910|Projects Requiring ...