File #: 19-965    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 6/27/2019 In control: Water Utilities Department
On agenda: 10/23/2019 Final action:
Title: Authorize a professional services contract with Garver, LLC for the engineering design of Storm Drainage Contract D (list attached to the Agenda Information Sheet) - Not to exceed $599,921.00 - Financing: Flood Control (D) Fund (2017 Bond Funds)
Indexes: 14, 2
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: October 23, 2019
COUNCIL DISTRICT(S): 2, 14
DEPARTMENT: Water Utilities Department
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

Title
Authorize a professional services contract with Garver, LLC for the engineering design of Storm Drainage Contract D (list attached to the Agenda Information Sheet) - Not to exceed $599,921.00 - Financing: Flood Control (D) Fund (2017 Bond Funds)

Body
BACKGROUND

This action will authorize a professional services contract with Garver, LLC for the engineering design of storm drainage improvement projects at six locations. The City of Dallas has determined that these locations require improvements to provide adequate capacity for the conveyance of storm water flows and address localized flooding during storm events. The proposed projects are part of the 2017 Bond Program, Proposition D for flood protection and storm drainage.
Each location has distinct challenges that require engineering analysis and design services. The scope of work includes design services for drainage system and inlet improvement projects to protect structures from flooding. The services provided include project management, topographic and boundary surveys, subsurface utility exploration, geotechnical investigations, permitting assistance, development of conceptual and preliminary construction plans, and development of pre-final and final construction plans and special specifications.
The consulting firm was selected following a qualifications-based selection process in accordance with the City of Dallas Administrative Directive 4-5 procurement guidelines.
Following are the locations and design costs for each project:
Projects Council District Amount

Gifford-Roanoke Area Relief System|99|$189,420.00

1300, 1301 Munger Boulevard 14 $ 11,713.00
(5200 Bryan Street)

3700 Alderson Street 14 $185,000.00

3215 Homer...