Title: Authorize a professional services contract with Garver, LLC for the engineering design of Storm Drainage Contract D (list attached to the Agenda Information Sheet) - Not to exceed $599,921.00 - Financing: Flood Control (D) Fund (2017 Bond Funds)
Indexes: 14, 2
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Mobility Solutions, Infrastructure, and Sustainability

AGENDA DATE:                     October 23, 2019

COUNCIL DISTRICT(S):                     2, 14

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with Garver, LLC for the engineering design of Storm Drainage Contract D (list attached to the Agenda Information Sheet) - Not to exceed $599,921.00 - Financing: Flood Control (D) Fund (2017 Bond Funds)

 

Body

BACKGROUND

 

This action will authorize a professional services contract with Garver, LLC for the engineering design of storm drainage improvement projects at six locations. The City of Dallas has determined that these locations require improvements to provide adequate capacity for the conveyance of storm water flows and address localized flooding during storm events. The proposed projects are part of the 2017 Bond Program, Proposition D for flood protection and storm drainage.

Each location has distinct challenges that require engineering analysis and design services. The scope of work includes design services for drainage system and inlet improvement projects to protect structures from flooding.  The services provided include project management, topographic and boundary surveys, subsurface utility exploration, geotechnical investigations, permitting assistance, development of conceptual and preliminary construction plans, and development of pre-final and final construction plans and special specifications.

The consulting firm was selected following a qualifications-based selection process in accordance with the City of Dallas Administrative Directive 4-5 procurement guidelines.

Following are the locations and design costs for each project:

Projects                     Council District                     Amount

 

Gifford-Roanoke Area Relief System                     2                     $189,420.00

 

1300, 1301 Munger Boulevard                     14                     $  11,713.00

(5200 Bryan Street)

 

3700 Alderson Street                     14                     $185,000.00

 

3215 Homer Street                     14                     $  19,200.00

 

State-Thomas-Flora/Boll to Fairmont                     14                     $  99,000.00

 

State-Thomas-Hallsville/Worthington                     14                     $  95,588.00

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                     December 2019

Complete Design                     December 2020

Begin Construction                     June 2021

Complete Construction                     December 2022

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

FISCAL INFORMATION

 

Flood Control (D) Fund (2017 Bond Funds) - $599,921.00

 

                     Council District                     Amount

 

                      2                                          $189,420.00

                     14                                          $410,501.00

         

Total                                                                                    $599,921.00

 

Estimated Future Cost - Construction - $3,512,910.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Plan adopted on October 22, 2008, by Resolution No. 08-2826, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Category

M/WBE Goal

M/WBE %

M/WBE $

$599,921.00

Architectural & Engineering

25.66%

26.18%

$157,085.00

This contract exceeds the M/WBE goal.

 

 

 

 

 

OWNER

 

Garver, LLC

 

Brock Hoskins, President

 

MAPS

 