Dallas Logo
File #: 20-379    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 2/18/2020 In control: Water Utilities Department
On agenda: 3/25/2020 Final action: 3/25/2020
Title: Authorize Supplemental Agreement No. 2 to the professional services contract with Stantec Consulting Services, Inc. f/k/a Kellogg Brown & Root Services, Inc. for additional engineering services associated with the Bachman Dam and Spillway improvements and the dredging of Bachman Lake - Not to exceed $1,597,688.00, from $3,338,324.00 to $4,936,012.00 - Financing: Water Capital Improvement E Fund
Indexes: 13, 2, 6
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: March 25, 2020
COUNCIL DISTRICT(S): 2, 6, 13
DEPARTMENT: Water Utilities Department
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

Title
Authorize Supplemental Agreement No. 2 to the professional services contract with Stantec Consulting Services, Inc. f/k/a Kellogg Brown & Root Services, Inc. for additional engineering services associated with the Bachman Dam and Spillway improvements and the dredging of Bachman Lake - Not to exceed $1,597,688.00, from $3,338,324.00 to $4,936,012.00 - Financing: Water Capital Improvement E Fund

Body
BACKGROUND

The Bachman Dam and Spillway was built in 1901 and is located adjacent to the Bachman Lake Park northwest of Love Field Airport. The area is a highly utilized park with features such as a hike and bike trail, recreation center and newly planned improvements including an aquatics center, skate park and connections to adjacent green belt style recreation areas. A contract was initially awarded by Dallas Water Utilities to address structural and stability recommendations identified as part of a five-year cycle dam inspection. The contract was amended in 2011 to address additional study and design work associated with compliance with the Dam Safety Act and to design the relocation of a wastewater pipeline located in the area and crossing under the Bachman Dam. The design of the dam and spillway improvements was completed as directed at that time to meet only the existing hydraulic flows, but construction was put on-hold until the best future use of the lake could be evaluated. The pipeline relocation work continued, and construction was completed in 2015.

In 2016, the City Council authorized a Love Field / Bachman Lake Feasibility Study to investigate alternatives which could reduce flooding issues upstream and on the airport property as well as consider the needs of other depa...