File #: 20-445    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved as an Individual Item
File created: 2/25/2020 In control: Department of Public Works
On agenda: 5/13/2020 Final action: 5/13/2020
Title: Authorize Supplemental Agreement No. 1 to the professional services contract with Bridgefarmer & Associates, Inc., to provide engineering services for East Clarendon Drive from South Ewing Avenue to Upton Street and additional environmental engineering services for South Ewing Avenue from Interstate Highway 35E to East Clarendon Drive - Not to exceed $345,249.42, from $883,331.78 to $1,228,581.20 - Financing: Street and Transportation (A) Fund (2017 General Obligation Bond Fund) ($309,639.42), Water Capital Improvement D Fund ($13,175.70), and Wastewater Capital Improvement E Fund ($22,434.30)
Indexes: 4
Attachments: 1. Maps, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: May 13, 2020
COUNCIL DISTRICT(S):|910|DEPARTMENT: Department of Public Works
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

Title
Authorize Supplemental Agreement No. 1 to the professional services contract with Bridgefarmer & Associates, Inc., to provide engineering services for East Clarendon Drive from South Ewing Avenue to Upton Street and additional environmental engineering services for South Ewing Avenue from Interstate Highway 35E to East Clarendon Drive - Not to exceed $345,249.42, from $883,331.78 to $1,228,581.20 - Financing: Street and Transportation (A) Fund (2017 General Obligation Bond Fund) ($309,639.42), Water Capital Improvement D Fund ($13,175.70), and Wastewater Capital Improvement E Fund ($22,434.30)

Body
BACKGROUND

On April 10, 2019, City Council authorized a professional services contract with Bridgefarmer & Associates Inc., for the engineering design of paving, street widening, bicycle facilities, storm drainage, and water and wastewater improvements for the thoroughfare improvement project on South Ewing Avenue from Interstate Highway 35E (IH-35E) to East Clarendon Drive by Resolution No. 19-0493.

During the design of the Ewing Avenue Project, a drainage study and analysis was performed to determine the necessary drainage improvements near the intersection of Ewing Avenue and Clarendon Drive. The study concluded that the intersection was below the Cedar Creek 100-year flood elevation. The engineer will design a new bridge or culvert over Cedar Creek crossing South Ewing Avenue and East Clarendon Drive to raise the roadways and the intersection above the 100-year flood elevation. Consequently, it is necessary to include the East Clarendon Drive Project as part of the project design. In addition, due to the drainage improvements to Cedar Creek it is necessary to provide environmental en...