Dallas Logo
File #: 20-592    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved as an Individual Item
File created: 3/20/2020 In control: Department of Public Works
On agenda: 5/13/2020 Final action: 5/13/2020
Title: Authorize a professional services contract with Rone Engineering Services, Ltd. to provide material testing services during construction of the Street Reconstruction Groups 17-1207, 17-6001 and Street Reconstruction Package B (list attached to the Agenda Information Sheet) - Not to exceed $215,332.00 - Financing: Street and Transportation (A) Fund (2017 General Obligation Bond Fund)
Indexes: 10, 12, 2, 6
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: May 13, 2020
COUNCIL DISTRICT(S): 2, 6, 10, 12
DEPARTMENT: Department of Public Works
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

Title
Authorize a professional services contract with Rone Engineering Services, Ltd. to provide material testing services during construction of the Street Reconstruction Groups 17-1207, 17-6001 and Street Reconstruction Package B (list attached to the Agenda Information Sheet) - Not to exceed $215,332.00 - Financing: Street and Transportation (A) Fund (2017 General Obligation Bond Fund)

Body
BACKGROUND

The Request for Qualifications (CIZ1728) was issued on August 27, 2018 for the 2018 Construction Material Testing Services. The consulting firm, Rone Engineering Services, Ltd. was selected following a qualifications-based selection process in accordance with the City of Dallas procurement guidelines.

This action will authorize a professional services contract with Rone Engineering Services, Ltd. for the construction material testing services for construction of Street Reconstruction Groups 17-1207, 17-6001 and Street Reconstruction Package B. These testing services are required to assure that the material utilized during construction is in conformance with the quality required by the project specifications.

Following are the locations and design costs for each project:

Street Reconstruction - Improvements

Project Council District Amount

Lenel Place from Clover Lane
to Wemdon Drive 2 $18,563.00

Bombay Avenue from Huron Drive
to Thurston Drive 2 $20,697.00

Fillmore Drive from Empire Central
to Register Avenue 2 $16,166.00

Canada Drive from Babcock Drive
to Leesberg Street 6 $19,269.00

Lenel Place from Clover Lane
to Wemdon Drive 6 $26,818.00

Lenel Place from Lively Lane
to Clover Lane 6 $21,020.00

Lenel Place fr...

Click here for full text