File #: 20-1318    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/8/2020 In control: Water Utilities Department
On agenda: 9/9/2020 Final action: 9/9/2020
Title: Authorize a construction contract for aeration improvements and associated components at the Central Wastewater Treatment Plant - Crescent Constructors, Inc., lowest responsible bidder of six - Not to exceed $18,327,000.00 - Financing: Wastewater Capital Improvement D Fund
Indexes: 4
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Mobility Solutions, Infrastructure, and Sustainability

AGENDA DATE:                     September 9, 2020

COUNCIL DISTRICT(S):                     4

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize a construction contract for aeration improvements and associated components at the Central Wastewater Treatment Plant - Crescent Constructors, Inc., lowest responsible bidder of six - Not to exceed $18,327,000.00 - Financing: Wastewater Capital Improvement D Fund

 

Body

BACKGROUND

 

The City of Dallas owns and operates two wastewater treatment plants with a combined treatment capacity of 280 million gallons per day.  Central Wastewater Treatment Plant (CWWTP) is the largest of the two plants, located just south of downtown.  CWWTP consists of two separate activated sludge treatment process trains, Complex A and Complex B, with blowers that deliver diffused air as part of the treatment process. Five single-stage centrifugal blowers currently supply diffused air to Complex A and Complex B, filter backwash and the post aeration process. The blowers were installed in 1987 and are reaching the end of their useful life along with many of the associated components and delivery system.

 

The aeration system is critical for wastewater treatment and meeting regulatory permit requirements.  In order to remove organic solids from wastewater, a continuous supply of diffused air is required.  The current configuration offers no redundancy, and given the age of the blowers and the difficulties associated with maintaining them, it is paramount to provide CWWTP with a new reliable aeration facility.

 

This action will authorize a contract for the construction of the Complex B Blower Facility with structural, architectural, mechanical, HVAC, plumbing, electrical and instrumentation components.  The work also includes construction of a new 36-inch low pressure air pipe from the blower facility to the existing 42-inch low pressure air pipe, connection to existing piping, utility relocations, modifications to the air piping at Complex B Aeration Basins 1 through 4, installation of new valves, flowmeters, pipe supports, insulation, instrumentation and electrical components, and repair of air leaks at various locations including Complex A, existing 42-inch low pressure air pipe, and filter gallery.  Lastly, the scope of this project also includes construction of an electrical loop that will provide power to the new facility.

Crescent Constructors, Inc. has had no contractual activities with the City of Dallas within the past three years.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                     November 2020

Complete Construction                     November 2022

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

              FY 2020

        FY 2021

   Future Years

Wastewater Capital Improvement D Fund

  $18,327,000.00

            $0.00

              $0.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Plan adopted on October 22, 2008, by Resolution No. 08-2826, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Category

M/WBE Goal

M/WBE %

M/WBE $

$18,327,000.00

Construction

25.00%

25.39%

$4,652,667.00

This contract exceeds the M/WBE goal.

Crescent Constructors, Inc. - Non-Local; Workforce - 55.46% Local 

 

PROCUREMENT INFORMATION

 

The following six bids with quotes were opened on June 19, 2020:

 

*Denotes successful bidder

 

Bidders                     Bid Amount

 

*Crescent Constructors, Inc.                     $18,327,000.00

 2560 Technology Drive, Suite 400

 Plano, Texas 75074

BAR Constructors, Inc.                     $18,570,900.00

Archer Western Construction, LLC                     $18,709,500.00

PLW Waterworks, LLC                     $19,728,000.00

Kiewit Water Facilities South Co.                     $23,550,000.00

Oscar Renda Construction, Inc.                     $23,566,000.00

 

OWNER

 

Crescent Constructors, Inc.

 

Michael G. Daigre, President

 

MAP

 

Attached