File #: 20-1536    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 8/7/2020 In control: Water Utilities Department
On agenda: 11/11/2020 Final action: 11/11/2020
Title: Authorize Supplemental Agreement No. 1 to the professional services contract with Garver, LLC to provide additional engineering services required for investigation, preliminary design, development of construction plans and specifications, and bid phase services for the Kidd Springs Drainage Tunnel Rehabilitation - Not to exceed $89,945.00, from $886,940.13 to $976,885.13 - Financing: Storm Drainage Management Capital Construction Fund
Indexes: 1
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: November 11, 2020
COUNCIL DISTRICT(S):|910|DEPARTMENT: Water Utilities Department
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

Title
Authorize Supplemental Agreement No. 1 to the professional services contract with Garver, LLC to provide additional engineering services required for investigation, preliminary design, development of construction plans and specifications, and bid phase services for the Kidd Springs Drainage Tunnel Rehabilitation - Not to exceed $89,945.00, from $886,940.13 to $976,885.13 - Financing: Storm Drainage Management Capital Construction Fund

Body
BACKGROUND

On June 12, 2019, City Council authorized a professional services contract with Garver, LLC for the engineering design of three storm drainage improvement projects at Coombs Creek adjacent to 1641 Junior Drive, Lisbon Area C, and Pleasant Branch. In the course of performing engineering efforts to replace a failed section of storm sewer outfall and box culvert near 1641 Junior Drive, a visual inspection of the drainage tunnel further upstream was conducted. Portions of the existing 8-foot wide horseshoe drainage tunnel were found to be in poor condition with evidence of infiltration, corrosion, and degradation of the concrete material.

Dallas Water Utilities in consultation with Garver, LLC has determined that portions of the existing Kidd Springs Drainage Tunnel require repair or rehabilitation to ensure continued service and required drainage conveyance for the area. This action will authorize a supplemental agreement to the existing professional services contract to fully evaluate the tunnel and determine the most effective repair and rehabilitation strategy. The section of tunnel to be addressed runs generally under Junior Drive from West Greenbriar Lane to Kessler Parkway Park and was originally constructed in the 1930s. The...