Dallas Logo
File #: 20-1648    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 8/18/2020 In control: Water Utilities Department
On agenda: 11/11/2020 Final action: 11/11/2020
Title: Authorize a professional services contract with Jones & Carter, Inc to provide engineering services for storm drainage and erosion control improvements at 11 locations within the City of Dallas (list attached to the Agenda Information Sheet) - Not to exceed $874,924.00 - Financing: Flood Control (D) Fund (2017 General Obligation Bond Funds) ($420,926.00), Flood Protection and Storm Drainage Facilities (2006 General Obligation Bond Funds) ($250,348.00), Flood Protection and Storm Drainage Facilities (2012 General Obligation Bond Funds) ($136,253.00), and Storm Drainage Management Capital Construction Fund ($67,397.00)
Indexes: 10, 11, 13, 4, 5, 6, 7, 9
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Mobility Solutions, Infrastructure, and Sustainability

AGENDA DATE:                     November 11, 2020

COUNCIL DISTRICT(S):                     4, 5, 6, 7, 9, 10, 11, 13

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with Jones & Carter, Inc to provide engineering services for storm drainage and erosion control improvements at 11 locations within the City of Dallas (list attached to the Agenda Information Sheet) - Not to exceed $874,924.00 - Financing: Flood Control (D) Fund (2017 General Obligation Bond Funds) ($420,926.00), Flood Protection and Storm Drainage Facilities (2006 General Obligation Bond Funds) ($250,348.00), Flood Protection and Storm Drainage Facilities (2012 General Obligation Bond Funds) ($136,253.00), and Storm Drainage Management Capital Construction Fund ($67,397.00)

 

Body

BACKGROUND

 

This action will authorize a professional services contract with Jones & Carter, Inc. for the engineering evaluation and design of storm drainage and erosion control improvements at 11 locations.  Known flooding issues will be evaluated at 7 locations and recommendations along with construction plans and specifications will be developed for storm drainage improvements.  These locations include 616 Calcutta Drive, Yewpon Avenue at Kingsley Drive, 3602 Loganwood Drive, 3808 Lively Lane, Preston Hollow Channel, Phase 1& 2, 3162 Royal Lane, and Teakwood Drive at Elmridge Drive.  Erosion control improvements will be evaluated at the remaining locations, including 816 Glen Oaks Boulevard, 2447 Highland Road, 1739, 1745, 1751 Tamarack Drive, and 13156 Burning Log Lane.

 

The services provided for this project include project management, topographic and boundary surveys, subsurface utility exploration, hydrologic and hydraulic studies, development of conceptual and preliminary construction plans, and development of final construction plans and special specifications.  Proposed improvements will alleviate existing flooding and stabilize eroded stream banks. 

 

The consulting firm for this project was selected following a qualifications-based process in accordance with City of Dallas Administrative Directive 4-5 procurement guidelines.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                     December 2020

Complete Design                     December 2021

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2021

FY 2022

Future Years

Flood Control (D) Fund (2017 General Obligation Bond Funds)

$420,926.00

$0.00

$0.00

Flood Protection and Storm Drainage Facilities Fund (2006 General Obligation Bond Funds)

$250,348.00

$0.00

$0.00

Flood Protection and Storm Drainage Facilities Fund (2012 General Obligation Bond Funds)

$136,253.00

$0.00

$0.00

Storm Drainage Management Capital Construction Fund

$67,397.00

$0.00

$0.00

Total

$874,924.00

$0.00

$0.00

 

                     Council District                     Amount

 

                     4                     $353,354.00

                     5                     $  41,038.00

                     6                     $  37,688.00

                     7                     $  37,069.00

                     9                     $  64,705.00

                     10                     $  35,939.00

                     11                     $  60,089.00

                     13                     $245,042.00

 

                     Total                     $874,924.00

 

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Category

M/WBE Goal

M/WBE %

M/WBE $

$874,924.00

Architectural & Engineering

25.66%

29.83%

$260,995.00

This contract exceeds the M/WBE goal.

Jones & Carter, Inc. - Non-Local; Workforce - 78.84% Local

 

OWNER

 

Jones & Carter, Inc.

 

Robert L. Aylward, President

 

MAPS

 

Attached