Dallas Logo
File #: 20-1790    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 9/10/2020 In control: Water Utilities Department
On agenda: 11/11/2020 Final action: 11/11/2020
Title: Authorize a construction contract for the installation of erosion control and storm drainage improvements at eight locations (list attached to Agenda Information Sheet) - Stoic Civil Construction, Inc., lowest responsible bidder of five - Not to exceed $4,522,689.50 - Financing: Flood Control (D) Fund (2017 General Obligation Bond Funds) ($3,161,623.50), Storm Drainage Management Capital Construction Fund ($879,875.00) and Flood Protection and Storm Drainage Facilities Fund (2006 General Obligation Bond Funds) ($481,191.00)
Indexes: 1, 10, 3, 4, 5
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Mobility Solutions, Infrastructure, and Sustainability

AGENDA DATE:                     November 11, 2020

COUNCIL DISTRICT(S):                     1, 3, 4, 5, 10

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize a construction contract for the installation of erosion control and storm drainage improvements at eight locations (list attached to Agenda Information Sheet) - Stoic Civil Construction, Inc., lowest responsible bidder of five - Not to exceed $4,522,689.50 - Financing: Flood Control (D) Fund (2017 General Obligation Bond Funds) ($3,161,623.50), Storm Drainage Management Capital Construction Fund ($879,875.00) and Flood Protection and Storm Drainage Facilities Fund (2006 General Obligation Bond Funds) ($481,191.00)

 

Body

BACKGROUND

 

Stream banks located along various properties are experiencing severe erosion and need to be stabilized to protect existing structures and critical infrastructure. Engineering solutions have been completed for eight locations experiencing severe erosion and one location with a failed box culvert.  This action will authorize a construction contract with Stoic Civil Construction, Inc. to implement engineering solutions to address critical erosion at these locations and fix the failed box culvert at Coombs Creek and Junior Drive.

 

The project improvements consist of the installation of gabion walls and mattresses for erosion control at the following eight locations: Coombs Creek - Along N. Plymouth Road from N. Hampton Road to W. Davis Street, 3335 Kiest Hill Drive, 6521/6629/6637/6729 Putting Green Drive, 6760 Talbot Parkway, 1122 Pentagon Parkway, 3100 Urban Avenue, 10720 and 10726 Meadowcliff Lane, and the Coombs Creek Storm Drain Outfall at Junior Drive. In addition, the existing box culvert outfall at Coombs Creek and Junior Drive will be replaced and extended to address a failed section impacting the stability of the adjacent trail and an existing wastewater pipeline.  Construction of the proposed gabion walls and mattresses will address critical erosion at these locations, protecting residential structures and other public infrastructure.

 

Stoic Civil Construction, Inc. has had no contractual activities with the City of Dallas within the past three years.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                     December 2020

Complete Construction                     June 2022

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2021

FY 2022

Future Years

Flood Control (D) Fund (2017 General Obligation Bond Funds)

$3,161,623.50

$0.00

$0.00

Storm Drainage Management Capital Construction Fund

$   879,875.00

$0.00

$0.00

Flood Protection and Storm Drainage Facilities Fund (2006 General Obligation Bond Funds)

$   481,191.00

$0.00

$0.00

Total

$4,522,689.50

$0.00

$0.00

 

                     Council District                     Amount

 

                     1                     $1,661,728.50

                     3                     $1,346,455.00

                     4                     $   272,131.00

                     5                     $   125,155.00

                     10                     $1,117,220.00

 

                                          Total                                                               $4,522,689.50

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Category

M/WBE Goal

M/WBE %

M/WBE $

$4,522,689.50

Construction

25.00%

20.38%

$921,833.00

This contract does not meet the M/WBE goal, but complies with good faith efforts.

Stoic Civil Construction, Inc - Non Local; Workforce - 10.00% Local

 

PROCUREMENT INFORMATION

 

The following five bids with quotes were opened on August 7, 2020:

 

*Denotes successful bidder

 

Bidders                     Bid Amount

 

*Stoic Civil Construction, Inc.                     $4,522,689.50

 223 West Sycamore Street

 Denton, Texas 76201

J.B. & CO., LLC                     $4,969,258.00

Ark Contracting Services, LLC                     $5,455,072.00

Joe Funk Construction, Inc.                     $7,394,361.00

Thalle Construction Co., Inc.                     $8,713,109.00

                                                                                    

OWNER

 

Stoic Civil Construction, Inc.

 

James Fee, President

 

MAPS

 

Attached