STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: December 9, 2020
COUNCIL DISTRICT(S): 6
DEPARTMENT: Water Utilities Department
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT
Title
Authorize Supplemental Agreement No. 1 to the professional services contract with Halff Associates, Inc. to provide additional engineering and architectural services for a replacement Stormwater Operations Center to be located at 2245 Irving Boulevard - Not to exceed $537,576.23, from $2,221,742.32 to $2,759,318.55 - Financing: Storm Drainage Management Capital Construction Fund
Body
BACKGROUND
The Stormwater Operations Division of the Dallas Water Utilities operates and maintains the City’s drainage system that includes public creeks, rivers and associated infrastructure. This includes 11 storm drainage pump stations with a pumping capacity of 2.8 billion gallons per day, 1,963 miles of storm drainage pipes and 170 miles of earthen and concrete creek channels. A significant portion of stormwater operations and maintenance activities are performed from the facilities currently located at 2255 Irving Boulevard.
The facilities located at this site were constructed in the 1940’s. They do not meet current City Codes, have reached the end of their service life, and have been on the replacement inventory list since 1995. Based on the condition assessment of these facilities they have reached their maximum life expectancy and have become a hazard to the supervisory control and data acquisition (SCADA) equipment and the employees. The roofs on two buildings are at the point of failure and cannot be safely maintained or repaired. The foundation is failing on the main building creating a tripping hazard in the main corridor and creating a risk to the adjacent sump channel.
This action includes additional engineering and architectural services to implement health and safety policy design elements as they are related to COVID-19 standards, updates to Leadership in Energy and Environmental Design and Americans with Disabilities Act Compliant requirements that have been implemented post completion of plans and specifications, and construction administration required in coordination of the 150-foot communication tower installation.
ESTIMATED SCHEDULE OF PROJECT
Begin Design January 2020
Complete Design June 2022
PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)
This item has no prior action.
FISCAL INFORMATION
Fund |
FY 2021 |
FY 2022 |
Future Years |
Storm Drainage Management Capital Construction Fund |
$537,576.23 |
$0.00 |
$0.00 |
Design $2,221,742.32
Supplemental Agreement No. 1 (this action) $ 537,576.23
Total Project Cost $2,759,318.55
M/WBE INFORMATION
In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:
Contract Amount |
Category |
M/WBE Goal |
M/WBE % |
M/WBE $ |
$537,576.23 |
Architectural & Engineering |
25.66% |
12.72% |
$68,375.00 |
• This contract does not meet the M/WBE goal, but complies with good faith efforts. |
• Supplemental Agreement No. 1 - 27.10% overall M/WBE participation |
• Halff Associates, Inc. - Local; Workforce - 22.18% Local |
OWNER
Halff Associates, Inc.
Mark Edwards, President/Chief Executive Officer
MAP
Attached