Dallas Logo
File #: 20-2477    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 12/10/2020 In control: Department of Transportation
On agenda: 1/13/2021 Final action:
Title: Authorize the (1) acceptance of a grant from the United States Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Congestion Mitigation and Air Quality Improvement Program (Agreement No. CSJ 0581-01-157, CFDA No. 20.205) in the amount of $1,212,500.00 as federal and state share in the total project engineering cost of $1,304,805.00 (includes $1,212,500.00 in Federal and State reimbursement, Direct State Cost of $37,500.00, and Indirect State $54,805.00 participation) for costs related to the preparation of preliminary engineering (design schematic, environmental documents/public involvement), plans, specifications and estimates to allow for the construction of intersection improvements including regrading, repaving, and sidewalks at Carbondale Street and Great Trinity Forest Way in the City of Dallas; (2) establishment of appropriations in the amount of $1,212,500.00 in the Carbondale Project Grant Fund; (3) receip...
Indexes: 7
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: January 13, 2021
COUNCIL DISTRICT(S):|910|DEPARTMENT: Department of Transportation
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

title
Authorize the (1) acceptance of a grant from the United States Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Congestion Mitigation and Air Quality Improvement Program (Agreement No. CSJ 0581-01-157, CFDA No. 20.205) in the amount of $1,212,500.00 as federal and state share in the total project engineering cost of $1,304,805.00 (includes $1,212,500.00 in Federal and State reimbursement, Direct State Cost of $37,500.00, and Indirect State $54,805.00 participation) for costs related to the preparation of preliminary engineering (design schematic, environmental documents/public involvement), plans, specifications and estimates to allow for the construction of intersection improvements including regrading, repaving, and sidewalks at Carbondale Street and Great Trinity Forest Way in the City of Dallas; (2) establishment of appropriations in the amount of $1,212,500.00 in the Carbondale Project Grant Fund; (3) receipt and deposit of funds in the amount of $1,212,500.00 in the Carbondale Project Grant Fund; and (4) execution of the Local Project Advance Funding Agreement with TxDOT in a total approximate amount of $1,304,805.00 and all terms, conditions, and documents required by the grant agreement - Total amount of $1,212,500.00 - Financing: Texas Department of Transportation Grant Funds

body
BACKGROUND

Union Pacific Railroad (UPRR) housed an intermodal operation known as Miller Yard located on the west side of Linfield Road near the Joppa community in Dallas, Texas. In 2005, UPRR relocated its multimodal operation away from Miller Yard but maintained its status as a multi-use operation. In 2002, a vehicular br...

Click here for full text