Dallas Logo
File #: 21-47    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 1/13/2021 In control: Park & Recreation Department
On agenda: 2/10/2021 Final action:
Title: Authorize Supplemental Agreement No. 1 to the professional services contract with Pacheco Koch Consulting Engineers, Inc. for an increase to the design and engineering services for the Crawford Memorial Park Phase 1 Improvements Project located at 8700 Elam Road - Not to exceed $470,550.00, from $655,667.00 to $1,126,217.00 - Financing: Park and Recreation Facilities (2006 General Obligation Bond Funds)
Indexes: 5
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Quality of Life
AGENDA DATE: February 10, 2021
COUNCIL DISTRICT(S):|910|DEPARTMENT: Park & Recreation Department
EXECUTIVE: John D. Jenkins
______________________________________________________________________
SUBJECT

Title
Authorize Supplemental Agreement No. 1 to the professional services contract with Pacheco Koch Consulting Engineers, Inc. for an increase to the design and engineering services for the Crawford Memorial Park Phase 1 Improvements Project located at 8700 Elam Road - Not to exceed $470,550.00, from $655,667.00 to $1,126,217.00 - Financing: Park and Recreation Facilities (2006 General Obligation Bond Funds)

Body
BACKGROUND

The original contract award included schematic design of the Crawford Memorial Park Master Plan, Phase 1 Implementation, construction of a dam on Prairie Creek and creation of a lake, removal and relocation of an existing pedestrian bridge, re-establishment and expansion of a loop trail across the dam, boat ramps, environmental evaluation, hydraulic and hydrologic evaluations, water rights and Texas Commission on Environmental Quality permit applications.

This action will authorize Supplemental Agreement No. 1 to the professional services contract with Pacheco Koch Consulting Engineers, Inc. for an increase to the design and engineering services for the Crawford Memorial Park Phase 1 Improvements Project, in an amount not to exceed $470,550.00, increasing the contract amount from $655,667.00 to $1,126,217.00.

Supplemental Agreement No. 1 advances Phase 1 from schematic design to construction and bidding documents for elements including relocating trails and a pedestrian bridge impacted by the future dam and lake; safety lighting options; parking lot renovations; peninsula improvements including artistic elements; incorporation of artistic elements into shade structures, picnic areas, and observation areas. Additional work includes design and engineering services including topographic survey, geotechni...