File #: 21-366    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 2/22/2021 In control: Department of Transportation
On agenda: 4/14/2021 Final action:
Title: Authorize (1) the acceptance of a grant from the United States Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Congestion Mitigation and Air Quality (CMAQ) Improvement Program (Agreement No. CSJ 0918-47-281 and ROWCSJ 0918-47-302, CFDA No. 20.205) in the amount of $3,453,238.00 as federal share in the total project cost of $4,599,748.00 (includes Federal and State participation of $3,718,820.00) for costs related to the preparation of preliminary engineering (design schematic, environmental documents/public involvement), plans, specifications and estimates, right-of-way acquisition, utility relocations, and construction of pedestrian improvements including traffic signals, sidewalks, crosswalks, lighting, and intersection improvements at various locations within the boundaries of U.S. (US) Route-75 to the west, Greenville Avenue to the east, Lovers Lane to the north, and Mockingbird Lane to the south in the City...
Indexes: 14
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Mobility Solutions, Infrastructure, and Sustainability

AGENDA DATE:                     April 14, 2021

COUNCIL DISTRICT(S):                     14

DEPARTMENT:                     Department of Transportation

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

title

Authorize (1) the acceptance of a grant from the United States Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Congestion Mitigation and Air Quality (CMAQ) Improvement Program (Agreement No. CSJ 0918-47-281 and ROWCSJ 0918-47-302, CFDA No. 20.205) in the amount of $3,453,238.00 as federal share in the total project cost of $4,599,748.00 (includes Federal and State participation of $3,718,820.00) for costs related to the preparation of preliminary engineering (design schematic, environmental documents/public involvement), plans, specifications and estimates, right-of-way acquisition, utility relocations, and construction of pedestrian improvements including traffic signals, sidewalks, crosswalks, lighting, and intersection improvements at various locations within the boundaries of U.S. (US) Route-75 to the west, Greenville Avenue to the east, Lovers Lane to the north, and Mockingbird Lane to the south in the City of Dallas; (2) the establishment of appropriations in the amount of $3,453,238.00 in the Mockingbird/US-75 Project Grant Fund; (3) the receipt and deposit of funds in the amount of $3,453,238.00 in the Mockingbird/US-75 Project Grant Fund; (4) a required local match in the amount of $880,928.00 from 2017 General Obligation Bond Funds; (5) the disbursement of a portion of local match funds in the amount of $17,618.00 to be issued as warrant checks to TxDOT for State engineering, right-of-way/utility, and construction costs and other State direct costs related to the project (includes $8,810.00 initial payment and $8,808.00 payment prior to construction); and (6) execution of the Local Project Advance Funding Agreement with TxDOT in the amount of $4,599,748.00 and all terms, conditions, and documents required by the grant agreement - Total amount of $4,334,166.00 - Financing: Texas Department of Transportation Grant Funds ($3,453,238.00) and Street and Transportation (A) Fund (2017 General Obligation Bond Funds) ($880,928.00)

 

body

BACKGROUND

 

This action establishes an Advance Funding Agreement with TxDOT for costs related to the preparation of preliminary engineering (design schematic, environmental documents/public involvement), plans, specifications and estimates, right-of-way acquisition/utility relocations, and construction of pedestrian improvements including traffic signals, sidewalks, crosswalks, lighting, and intersection improvements at various locations within the boundaries of US-75 to the west, Greenville Avenue to the east, Lovers Lane to the north, and Mockingbird Lane to the south in the City of Dallas.

 

The City’s required local match of $880,928.00 for this project is included in the 2017 Bond Program.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Engineering Design                     September 2021

Complete Engineering Design                     September 2022

Begin Right-of-Way Acquisition                     September 2022

Complete Right-of-Way Acquisition                     September 2023

Begin Construction                      December 2023

Complete Construction                     December 2024

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2021

FY 2022

Future Years

TxDOT/Federal Share

$3,453,238.00

$0.00

$0.00

Street and Transportation (A) Funds (2017 General Obligation Bond Funds)

$   880,928.00

$0.00

$0.00

Total

$4,334,166.00

$0.00

$0.00

 

Estimated Project Costs

 

Engineering Design (City - 20%)                     $     70,474.00 (est.)

Engineering Design (Federal - 80%)                     $   281,897.00 (est.)

Right-of-Way Acquisition/Utility Relocations (City - 20%)                     $   544,250.00 (est.)

Right-of-Way Acquisition/Utility Relocations (Federal - 80%)                     $2,177,000.00 (est.)

Construction (City - 20%)                     $   266,204.00 (est.)

Construction (Federal - 80%)                     $1,064,815.00 (est.)

TxDOT Indirect State Cost (TxDOT - 100%)                     $   195,108.00 (est.)

 

Estimated Total Project Costs                     $4,599,748.00 (est.)

 

MAP

 

Attached