STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: June 9, 2021
COUNCIL DISTRICT(S): All
DEPARTMENT: Water Utilities Department
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT
Title
Authorize a construction services contract for (1) an eighteen-month master agreement for water and wastewater small services installations in the amount of $5,340,775.00; (2) the installation of water and wastewater mains at four locations in the amount of $2,571,487.50 (list attached to the Agenda Information Sheet); and (3) an eighteen-month master agreement for water and wastewater mainline extensions and emergency mainline installations and relocations at various locations in the amount of $2,645,375.00 - Total not to exceed $10,557,637.50 - Douglas Dailey Construction, LLC, lowest bidder of three - Financing: Water Construction Fund ($5,414,338.75) and Wastewater Construction Fund ($5,143,298.75)
Body
BACKGROUND
Part One of this action, in the amount of $5,340,775.00, consists of a small services 18-month master agreement for the installation of 3/4 inch to 2-inch water services and 6-inch wastewater connections, as requested by the Sustainable Development and Construction Department, upon issuance of a permit to the property owner.
Part Two of this action, in the amount of $2,571,487.50, includes the installation of approximately 30 feet of 4-inch, 280 feet of 6-inch, and 2,640 feet of 8-inch water mains, and the installation of approximately 2,920 feet of 8-inch, and 1,120 feet of 12-inch wastewater mains. The existing water and wastewater mains were built between 1926 and 1968. These mains are contributing to an increase in maintenance costs, as well as service interruptions. The installation of the proposed segments will improve the capacity of the water and wastewater systems and reduce maintenance costs.
Part Three of this action, in the amount of $2,645,375.00, includes wa...