File #: 21-1251    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 7/7/2021 In control: Water Utilities Department
On agenda: 9/9/2021 Final action:
Title: Authorize a construction services contract for the installation of water and wastewater main improvements at 32 locations (list attached to the Agenda Information Sheet) - Sisters Asphalt, Inc., lowest responsible bidder of nine - Not to exceed $10,694,206.00 - Financing: Water (Drinking Water) - TWDB 2020 Fund ($5,168,367.95), Wastewater (Clean Water) - 2020 TWDB Fund ($3,724,464.45), Street and Alley Improvement Fund ($1,488,194.50), and Water (Drinking Water) - TWDB 2019 Fund ($313,179.10)
Indexes: 10, 14, 2, 3, 7, 9
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: September 9, 2021
COUNCIL DISTRICT(S): 2, 3, 7, 9, 10, 14
DEPARTMENT: Water Utilities Department
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

Title
Authorize a construction services contract for the installation of water and wastewater main improvements at 32 locations (list attached to the Agenda Information Sheet) - Sisters Asphalt, Inc., lowest responsible bidder of nine - Not to exceed $10,694,206.00 - Financing: Water (Drinking Water) - TWDB 2020 Fund ($5,168,367.95), Wastewater (Clean Water) - 2020 TWDB Fund ($3,724,464.45), Street and Alley Improvement Fund ($1,488,194.50), and Water (Drinking Water) - TWDB 2019 Fund ($313,179.10)

Body
BACKGROUND

This action will authorize a construction services contract with Sisters Asphalt, Inc. for the installation and rehabilitation of approximately 46,510 feet of water and wastewater mains. This includes approximately 870 feet of 6-inch, 25,730 feet of 8-inch, and 3,650 feet of 12-inch water mains, and approximately 13,760 feet of 8-inch, and 2,500 feet of 12-inch wastewater mains.

The existing water and wastewater mains were built between 1930 and 1984. These mains are contributing to an increase in maintenance costs as well as service interruptions. The installation of the proposed segments will improve the capacity of the water and wastewater systems and reduce maintenance costs.

The construction contract includes water and wastewater main improvements in the Mesquite Heights neighborhood bounded by X-Ray Lane, Lindaloe Lane, Turnout Lane and West Camp Wisdom Road. This includes the installation of approximately 70 feet of 6-inch and 4,740 feet of 8-inch water mains, and the installation of approximately 3,190 feet of 8-inch and 800 feet of 12-inch wastewater mains. These improvements will increase equity across the City's water and wastewater systems and provi...