File #: 21-1251    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 7/7/2021 In control: Water Utilities Department
On agenda: 9/9/2021 Final action:
Title: Authorize a construction services contract for the installation of water and wastewater main improvements at 32 locations (list attached to the Agenda Information Sheet) - Sisters Asphalt, Inc., lowest responsible bidder of nine - Not to exceed $10,694,206.00 - Financing: Water (Drinking Water) - TWDB 2020 Fund ($5,168,367.95), Wastewater (Clean Water) - 2020 TWDB Fund ($3,724,464.45), Street and Alley Improvement Fund ($1,488,194.50), and Water (Drinking Water) - TWDB 2019 Fund ($313,179.10)
Indexes: 10, 14, 2, 3, 7, 9
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Mobility Solutions, Infrastructure, and Sustainability

AGENDA DATE:                     September 9, 2021

COUNCIL DISTRICT(S):                     2, 3, 7, 9, 10, 14

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize a construction services contract for the installation of water and wastewater main improvements at 32 locations (list attached to the Agenda Information Sheet) - Sisters Asphalt, Inc., lowest responsible bidder of nine - Not to exceed $10,694,206.00 - Financing: Water (Drinking Water) - TWDB 2020 Fund ($5,168,367.95), Wastewater (Clean Water) - 2020 TWDB Fund ($3,724,464.45), Street and Alley Improvement Fund ($1,488,194.50), and Water (Drinking Water) - TWDB 2019 Fund ($313,179.10)

 

Body

BACKGROUND

 

This action will authorize a construction services contract with Sisters Asphalt, Inc. for the installation and rehabilitation of approximately 46,510 feet of water and wastewater mains. This includes approximately 870 feet of 6-inch, 25,730 feet of 8-inch, and 3,650 feet of 12-inch water mains, and approximately 13,760 feet of 8-inch, and 2,500 feet of 12-inch wastewater mains.

 

The existing water and wastewater mains were built between 1930 and 1984. These mains are contributing to an increase in maintenance costs as well as service interruptions. The installation of the proposed segments will improve the capacity of the water and wastewater systems and reduce maintenance costs.

 

The construction contract includes water and wastewater main improvements in the Mesquite Heights neighborhood bounded by X-Ray Lane, Lindaloe Lane, Turnout Lane and West Camp Wisdom Road. This includes the installation of approximately 70 feet of 6-inch and 4,740 feet of 8-inch water mains, and the installation of approximately 3,190 feet of 8-inch and 800 feet of 12-inch wastewater mains.  These improvements will increase equity across the City’s water and wastewater systems and provide service to unserved properties in the Mesquite Heights neighborhood.

 

The following chart illustrates Sisters Asphalt, Inc.’s contractual activities with the City of Dallas for the past three years:

 

 

 

                     PBW                     DWU                     PKR                     TRN

 

Projects Completed                     0                     0                     0                     0

Active Projects                     0                     1                     0                     0

Change Orders                     0                     0                     0                     0

Projects Requiring Liquidated Damages                     0                     0                     0                     0

Projects Completed by Bonding Company                     0                     0                     0                     0

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                     November 2021

Complete Construction                     November 2023

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2021

FY 2022

Future Years

Water (Drinking Water) - TWDB 2020 Fund

$  5,168,367.95

$0.00

$0.00

Wastewater (Clean Water) - 2020 TWDB Fund

$  3,724,464.45

$0.00

$0.00

Street and Alley Improvement Fund

$  1,488,194.50

$0.00

$0.00

Water (Drinking Water) - TWDB 2019 Fund

$     313,179.10

$0.00

$0.00

Total

$10,694,206.00

$0.00

$0.00

 

Council District                                  Amount

 

                     2                     $     725,774.58

                     3                     $  2,327,144.50

                     7                     $     134,410.62

                     9                     $  2,498,154.19

                     10                     $  1,701,749.83

                     14                      $ 3,306,972.28

 

                     Total                     $10,694,206.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

 

Contract Amount

Procurement Category

M/WBE Goal

M/WBE %

M/WBE $

$10,694,206.00

Construction

32.00%

32.11%

$3,434,212.97

This contract exceeds the M/WBE goal.

Sisters Asphalt, Inc. - Local; Workforce - 28.00% Local

 

PROCUREMENT INFORMATION

 

The following nine bids with quotes were opened on June 11, 2021:

 

*Denotes successful bidder

 

Bidders                     Bid Amount

 

*Sisters Asphalt, Inc.                      $10,694,206.00

 2105 Waterview Parkway Suite A

 Richardson, Texas 75080

Muniz Construction, Inc.                     $10,947,450.88

Camino Construction, L.P                     $11,360,293.00

Ark Contracting Services, LLC                     $11,465,932.50

Canary Construction, Inc.                     $11,939,929.00

SYB Construction Co., Inc.                     $12,511,725.00

John Burns Construction Company of Texas                     $13,107,092.00

Omega Contracting, Inc.                     $14,057,210.05

Douglas Dailey Construction, LLC                     $14,074,156.00

 

OWNER

 

Sisters Asphalt, Inc.

 

Magen Lowery, Owner

 

MAPS

 

Attached