Dallas Logo
File #: 21-1487    Version: 1 Name:
Type: CONSENT AGENDA Status: Held Under Advisement
File created: 8/5/2021 In control: Department of Public Works
On agenda: 9/22/2021 Final action:
Title: Authorize a professional services contract with Garver, LLC for the preliminary engineering design of Street Thoroughfare Group 17-1106 (list attached to the Agenda Information Sheet) - Not to exceed $184,474.50 - Financing: Street and Transportation (A) Fund (2017 General Obligation Bond Funds)
Indexes: 11
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Mobility Solutions, Infrastructure, and Sustainability

AGENDA DATE:                     September 22, 2021

COUNCIL DISTRICT(S):                     11

DEPARTMENT:                     Department of Public Works

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with Garver, LLC for the preliminary engineering design of Street Thoroughfare Group 17-1106 (list attached to the Agenda Information Sheet) - Not to exceed $184,474.50 - Financing: Street and Transportation (A) Fund (2017 General Obligation Bond Funds)

 

Body

BACKGROUND

 

The Request for Qualifications (CIZ1721) was issued on May 31, 2018 for the 2017 Bond Projects. The consulting firm, Garver, LLC was selected following a qualifications-based selection process in accordance with the City of Dallas procurement guidelines.

 

This action will authorize a professional services contract with Garver, LLC for a feasibility study to provide a recommended alignment for the Street Thoroughfare Group 17-1106. The scope will include a feasibility study to establish a proposed roadway alignment to adhere to the current thoroughfare requirements, topographic and boundary survey, traffic data collection and traffic study, schematics, and a final alignment map.

 

Garver, LLC is a Dallas-based corporation, operating within the corporate city limits of Dallas, Texas.

 

Following are the locations and design costs for each project:

 

Project                     Council District                     Amount

 

Alpha Road from Barton Drive

to Noel Road                     11                     $45,771.00

 

Alpha Road from Noel Road

to Montfort Drive                     11                     $89,951.50

 

Alpha Road from End of Pavement

to Barton Drive                     11                     $48,752.00

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Study                     October 2021

Complete Study                     July 2022

Begin Construction                     December 2023

Complete Construction                     December 2024

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2021

FY 2022

Future Years

Street and Transportation (A) Fund (2017 General Obligation Bond Funds)

$184,474.50

$0.00

$0.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

M/WBE %

M/WBE $

$184,474.50

Architecture & Engineering

34.00%

38.83%

$71,634.00

This contract exceeds the M/WBE goal.

Garver, LLC - Local; Workforce - 41.00% Local

 

OWNER

 

Garver, LLC

 

Scott Forbes, Owner

 

MAPS

 

Attached