Dallas Logo
File #: 21-1372    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/22/2021 In control: Park & Recreation Department
On agenda: 9/22/2021 Final action:
Title: Authorize a professional services contract with DAL-TECH Engineering, Inc. for conceptual design, surveying and geotechnical services of Anderson Bonner Park erosion control design of gabion wall along White Rock Creek and adjacent to White Rock Creek Trail including storm water pipe, headwalls, survey, geotech, flood plain permits, and miscellaneous drainage improvements, near the 12000 block of Park Central Drive - Not to exceed $236,448.00 - Financing: Park and Recreation Facilities (B) Fund (2017 General Obligation Bond Fund) ($122,008.00), Flood Protection and Storm Drainage Facilities Fund (2012 General Obligation Bond Fund) ($77,724.92), and Flood Protection/Storm Drainage Fund (1995 General Obligation Bond Fund) ($36,715.08)
Indexes: 11
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Quality of Life
AGENDA DATE: September 22, 2021
COUNCIL DISTRICT(S): 11
DEPARTMENT: Park & Recreation Department
EXECUTIVE: John D. Jenkins
______________________________________________________________________
SUBJECT

Title
Authorize a professional services contract with DAL-TECH Engineering, Inc. for conceptual design, surveying and geotechnical services of Anderson Bonner Park erosion control design of gabion wall along White Rock Creek and adjacent to White Rock Creek Trail including storm water pipe, headwalls, survey, geotech, flood plain permits, and miscellaneous drainage improvements, near the 12000 block of Park Central Drive - Not to exceed $236,448.00 - Financing: Park and Recreation Facilities (B) Fund (2017 General Obligation Bond Fund) ($122,008.00), Flood Protection and Storm Drainage Facilities Fund (2012 General Obligation Bond Fund) ($77,724.92), and Flood Protection/Storm Drainage Fund (1995 General Obligation Bond Fund) ($36,715.08)

Body
BACKGROUND

This contract will include concept design development with hydraulic study, flood plain permits, surveying, geotechnical and cost estimation services. Existing amenities include a trail system along to the creek, parking lot, and near soccer fields. Design of erosion control gabion wall along White Rock Creek and adjacent to White Rock Creek Trail including storm water pipe, headwalls, survey, geotech, flood plain permits and miscellaneous drainage improvements. Design to include two Dallas Water Utilities erosion control areas for design with funding provided by DWU.

The Park & Recreation Department issued a Request for Qualifications in August 2021 for Engineering, Architecture, and Landscape Architecture Consulting Services for the 2020 Capital Improvement Projects. DAL-TECH Engineering was considered and selected as the most qualified firm to undertake this project per the consultant selection criteria in Administrative Directive 4-05 and for the particular scope of wor...

Click here for full text