Dallas Logo
File #: 21-1372    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/22/2021 In control: Park & Recreation Department
On agenda: 9/22/2021 Final action:
Title: Authorize a professional services contract with DAL-TECH Engineering, Inc. for conceptual design, surveying and geotechnical services of Anderson Bonner Park erosion control design of gabion wall along White Rock Creek and adjacent to White Rock Creek Trail including storm water pipe, headwalls, survey, geotech, flood plain permits, and miscellaneous drainage improvements, near the 12000 block of Park Central Drive - Not to exceed $236,448.00 - Financing: Park and Recreation Facilities (B) Fund (2017 General Obligation Bond Fund) ($122,008.00), Flood Protection and Storm Drainage Facilities Fund (2012 General Obligation Bond Fund) ($77,724.92), and Flood Protection/Storm Drainage Fund (1995 General Obligation Bond Fund) ($36,715.08)
Indexes: 11
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Quality of Life

AGENDA DATE:                     September 22, 2021

COUNCIL DISTRICT(S):                     11

DEPARTMENT:                     Park & Recreation Department

EXECUTIVE:                     John D. Jenkins

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with DAL-TECH Engineering, Inc. for conceptual design, surveying and geotechnical services of Anderson Bonner Park erosion control design of gabion wall along White Rock Creek and adjacent to White Rock Creek Trail including storm water pipe, headwalls, survey, geotech, flood plain permits, and miscellaneous drainage improvements, near the 12000 block of Park Central Drive - Not to exceed $236,448.00 - Financing: Park and Recreation Facilities (B) Fund (2017 General Obligation Bond Fund) ($122,008.00), Flood Protection and Storm Drainage Facilities Fund (2012 General Obligation Bond Fund) ($77,724.92), and Flood Protection/Storm Drainage Fund (1995 General Obligation Bond Fund) ($36,715.08)

 

Body

BACKGROUND

 

This contract will include concept design development with hydraulic study, flood plain permits, surveying, geotechnical and cost estimation services. Existing amenities include a trail system along to the creek, parking lot, and near soccer fields. Design of erosion control gabion wall along White Rock Creek and adjacent to White Rock Creek Trail including storm water pipe, headwalls, survey, geotech, flood plain permits and miscellaneous drainage improvements. Design to include two Dallas Water Utilities erosion control areas for design with funding provided by DWU.

 

The Park & Recreation Department issued a Request for Qualifications in August 2021 for Engineering, Architecture, and Landscape Architecture Consulting Services for the 2020 Capital Improvement Projects. DAL-TECH Engineering was considered and selected as the most qualified firm to undertake this project per the consultant selection criteria in Administrative Directive 4-05 and for the particular scope of work. This contract will include concept design development with hydraulic study, flood plain permits, surveying, geotechnical, construction document and cost estimation of erosion control gabion wall along White Rock Creek and adjacent to White Rock Creek Trail. Design scope includes two additional Dallas Water Utilities erosion control areas with funding provided by DWU.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Design                                           October 2021

Complete Design                                          August 2022                     

Begin Construction                                          January 2023

Complete Construction                     August 2023

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On August 5. 2021, The Park and Recreation Board authorized professional services contract with DAL-TECH Engineering, Inc. for conceptual design, surveying and geotechnical services of Anderson Bonner Park.

 

 

 

FISCAL INFORMATION

 

Fund

FY 2021

FY 2022

Future Years

Park and Recreation Facilities (B) Fund (2017 General Obligation Bond Fund)

$122,008.00

$0.00

$0.00

Flood Protection and Storm Drainage Facilities Fund (2012 General Obligation Bond Fund)

$77,724.92

$0.00

$0.00

Flood Protection/Storm Drainage Fund (1995 General Obligation Bond Fund)

$36,715.08

$0.00

$0.00

Total

$236,448.00

$0.00

$0.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

M/WBE %

M/WBE $

$236,448.00

Architecture & Engineering

34.00%

37.84%

$89,492.50

This contract exceeds the M/WBE goal.

DAL-TECH Engineering, Inc. - Local; Workforce - 0.00% Local

 

PROCUREMENT INFORMATION

 

In accordance with the City of Dallas Administrative Directive 4-05 procurement guidelines, APM & Associates, Inc. was selected as the most qualified consultant for this project.

 

 

 

 

OWNER

 

DAL-TECH Engineering, Inc.

 

Sedi Toumani, P.E.

 

MAP

 