File #: 21-1253    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/7/2021 In control: Water Utilities Department
On agenda: 10/27/2021 Final action:
Title: Authorize (1) a construction services contract for the installation of erosion control improvements at 18 locations (list attached to the Agenda Information Sheet) - Ark Contracting Services, LLC, lowest responsible bidder of four; and (2) an increase in appropriations not to exceed $3,370,896.00 in the Storm Drainage Management Capital Construction Fund - Not to exceed $6,883,991.55 - Financing: Flood Control (D) Fund (2017 General Obligation Bond Funds) ($3,252,206.55), Storm Drainage Management Capital Construction Fund ($3,370,896.00), and Flood Protection and Storm Drainage Facilities Fund (2012 General Obligation Bond Funds) ($260,889.00)
Indexes: 10, 11, 12, 13, 7, 9
Attachments: 1. List, 2. Maps, 3. Resolution, 4. Segment List
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Mobility Solutions, Infrastructure, and Sustainability

AGENDA DATE:                     October 27, 2021

COUNCIL DISTRICT(S):                     7, 9, 10, 11, 12, 13

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Majed Al-Ghafry

______________________________________________________________________

SUBJECT

 

Title

Authorize (1) a construction services contract for the installation of erosion control improvements at 18 locations (list attached to the Agenda Information Sheet) - Ark Contracting Services, LLC, lowest responsible bidder of four; and (2) an increase in appropriations not to exceed $3,370,896.00 in the Storm Drainage Management Capital Construction Fund - Not to exceed $6,883,991.55 - Financing: Flood Control (D) Fund (2017 General Obligation Bond Funds) ($3,252,206.55), Storm Drainage Management Capital Construction Fund ($3,370,896.00), and Flood Protection and Storm Drainage Facilities Fund (2012 General Obligation Bond Funds) ($260,889.00)

 

Body

BACKGROUND

 

Stream banks located along various properties are experiencing severe erosion and need to be stabilized to protect existing structures and critical infrastructure. Engineering solutions have been completed for eighteen locations experiencing severe erosion. This action will authorize a construction contract to implement engineering solutions to address critical erosion at these locations.

 

The project improvements consist of the installation of gabion walls, gabion mattresses, and other erosion control measures at the following 18 locations: 2420/2460/2522 El Cerrito Drive, 10500 Block of Clearbrook Lane, 3604 Hillside Drive, 1407 Oates Drive, 8470-8606 Brittania Way, 6523 & 6527 Clubhouse Circle, 13316 Spring Grove Avenue, 6201 Baymar Lane, 5719 Brushy Creek Trail, 7106/7110/7114 Claren Court, Country Brook Pond Dam, Country Brook Pond Banks, 15821 & 15827 Nedra Way, Osage Branch at Willow Greene Condos (17490 Meandering Way), 17309 & 17315 Stedman Circle, 17418 River Hill Drive, 17628 Squaw Valley, and the 3900 Block of Vinecrest Drive. The construction of the proposed erosion control structures will address critical erosion concerns at these locations.

 

The following chart illustrates Ark Contracting Services, LLC’s contractual activities with the City of Dallas for the past three years:

 

                     PBW                     DWU                     PKR                     TRN

 

Projects Completed                     5                     1                     0                     0

Active Projects                     0                     5                     0                     0

Change Orders                     0                     2                     0                     0

Projects Requiring Liquidated Damages                     0                     0                     0                     0

Projects Completed by Bonding Company                     0                     0                     0                     0

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                     December 2021

Complete Construction                     June 2023

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2022

FY 2023

Future Years

Flood Control (D) Fund (2017 General Obligation Bond Fund)

$3,252,206.55

$0.00

$0.00

Storm Drainage Management Capital Construction Fund

$3,370,896.00

$0.00

$0.00

Flood Protection and Storm Drainage Facilities Fund (2012 General Obligation Bond Funds)

$   260,889.00

$0.00

$0.00

Total

$6,883,991.55

$0.00

$0.00

 

                     Council District                     Amount

 

                     7                     $   604,035.00

                     9                     $1,161,825.55

                     10                     $   797,180.00

                     11                     $   396,818.00

                     12                     $3,537,783.00

                     13                     $   386,350.00

 

                                          Total                                                               $6,883,991.55

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

 

 

Contract Amount

Procurement Category

M/WBE Goal

M/WBE %

M/WBE $

$6,883,991.55

Construction

32.00%

11.35%

$781,475.00

This contract does not meet the M/WBE goal, but complies with good faith efforts.

Ark Contracting Services, LLC - Non-local; Workforce - 30.71% Local

 

The following four bids with quotes were received and opened on May 28, 2021:

 

*Denotes successful bidder

 

Bidders                     Bid Amount

 

*Ark Contracting Services, LLC                      $  6,883,991.55

 420 South Dick Price Road

 Kennedale, Texas 76060

Austin Filter Systems, Inc.                     $  7,951,425.00

Knight Erosion Control, Inc.                       $  8,489,777.18

HQS Construction, LLC                     $10,374,404.00

 

OWNER

 

Ark Contracting Services, LLC

 

Mark R. North, Chief Executive Officer

 

MAPS

 

Attached