Dallas Logo
File #: 22-1164    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 5/9/2022 In control: Water Utilities Department
On agenda: 6/22/2022 Final action:
Title: Authorize a professional services contract with Halff Associates, Inc. to provide engineering services for storm drainage and erosion control improvements at 3 locations (list attached to the Agenda Information Sheet) - Not to exceed $791,300.00 - Financing: Storm Drainage Management Capital Construction Fund
Indexes: 1, 3, 9
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Transportation & Infrastructure
AGENDA DATE: June 22, 2022
COUNCIL DISTRICT(S): 1, 3, 9
DEPARTMENT: Water Utilities Department
EXECUTIVE: Kimberly Bizor Tolbert
______________________________________________________________________
SUBJECT

Title
Authorize a professional services contract with Halff Associates, Inc. to provide engineering services for storm drainage and erosion control improvements at 3 locations (list attached to the Agenda Information Sheet) - Not to exceed $791,300.00 - Financing: Storm Drainage Management Capital Construction Fund

Body
BACKGROUND

This action will authorize a professional services contract with Halff Associates, Inc, for the engineering evaluation and design of storm drainage and erosion control improvements at 3 locations. Dallas Water Utilities has identified various properties in the City of Dallas impacted by stream erosion and flooding. Engineering evaluations and design improvements will be completed under this contract for Beckley Avenue at Coombs Creek, Hardin Creek along Kiesthill Drive, Kiestcrest Drive, and Kiest Forest Drive, and McCommas Branch at Wendover Road and Sperry Street. The services provided for this project include project management, topographic and boundary surveys, easement document preparation, subsurface utility exploration, geotechnical investigations, structural analysis, drainage studies including hydrologic and hydraulic stream and storm drain system modeling, and development of conceptual and final construction plans and special specifications.

Engineering services for Beckley at Coombs Creek include a study and conceptual design for removing the direct connection of the Beckley Avenue drainage system from the Coombs Creek Pressure Sewer and rerouting of the local drainage system to the Charlie Sump. The work under this contract at Hardin Creek includes an engineering study of stream bank erosion and conceptual design for properties adjacent to the creek in the 3300...

Click here for full text