Dallas Logo
File #: 22-1320    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 5/26/2022 In control: Water Utilities Department
On agenda: 8/10/2022 Final action:
Title: Authorize a construction services contract for major maintenance and rehabilitation improvements at Dallas Water Utilities' raw water system facilities located at Lake Ray Hubbard - Archer Western Construction, LLC, only bidder - Not to exceed $32,082,400.00 - Financing: Water Capital Improvement G Fund
Indexes: 9
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     August 10, 2022

COUNCIL DISTRICT(S):                     9

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Kimberly Bizor Tolbert

______________________________________________________________________

SUBJECT

 

Title

Authorize a construction services contract for major maintenance and rehabilitation improvements at Dallas Water Utilities’ raw water system facilities located at Lake Ray Hubbard - Archer Western Construction, LLC, only bidder - Not to exceed $32,082,400.00 - Financing: Water Capital Improvement G Fund

 

Body

BACKGROUND

 

Dallas Water Utilities (DWU) identified and evaluated 10 raw water facilities based on their age and condition, impact to the system, reliability, cost to operate, and frequency of repairs. The most critical raw water facilities were found to include the lake intake, Forney Pump Station, and Forney Dam at Lake Ray Hubbard. Lake Ray Hubbard is the only DWU reservoir owned and operated by the City of Dallas. The reservoir and associated water supply infrastructure were constructed in the late 1960’s and early 1970’s and several critical components require rehabilitation and replacement. 

 

This action will authorize a construction contract for major rehabilitation and replacement of infrastructure at Lake Ray Hubbard. Items targeted include traveling screens, sluice gate replacement at the intake, pump and valve replacement, site civil and groundwater monitoring improvements, monorail and bridge crane system improvements, new stop logs and storage building, heating, ventilation, and air conditioning upgrades, and electrical and control improvements for the Forney Dam. The existing facilities have reached the end of their useful life, have limited operability, and are difficult to access and repair.

 

At the Lake Ray Hubbard Intake, traveling screen #1 will be replaced and traveling screen #2 will be rehabilitated. Existing intake sluice gates, jib cranes, screen wash pumps and stop logs will be replaced. Security cameras will be installed with monitoring capability of personnel stationed at the East Side Water Treatment Plant. Three of six existing raw water pumping units will be replaced at the Forney Pump Station, equipped with performance monitoring instrumentation. Two of the new pumps will also be equipped with variable speed controls. In addition, all 42-inch suction and 36-inch discharge valves will be replaced. Specific improvements at the Forney Dam spillway include the repair of concrete spalling within the floor of the spillway structure and repairs to Gates No. 6 and 11 to address structural deficiencies and leaks. 

 

The following chart illustrates Archer Western Construction, LLC’s contractual activities with the City of Dallas for the past three years:

 

                     PBW                     DWU                     PKR                     TRN

 

Projects Completed                     0                     4                     0                     0

Active Projects                     0                     2                     0                     0

Change Orders                     0                     3                     0                     0

Projects Requiring Liquidated Damages                     0                     0                     0                     0

Projects Completed by Bonding Company                     0                     0                     0                     0

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                     October 2022

Complete Construction                     November 2024

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2022

FY 2023

Future Years

Water Capital Improvement G Fund

$32,082,400.00

$0.00

$0.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

M/WBE %

M/WBE $

$32,082,400.00

Construction

32.00%

32.00%

$10,266,368.00

This contract meets the M/WBE goal.

Archer Western Construction, LLC - Local; Workforce - 8.00% Local

 

PROCUREMENT INFORMATION

 

The following single bid was received and opened on April 1, 2022:

 

 

 

 

 

*Denotes only bidder

 

Bidder                     Bid Amount

 

*Archer Western Construction, LLC                      $32,082,400.00

 1411 Greenway Drive

 Irving, Texas 75038

 

Note: Dallas Water Utilities has reviewed this procurement and determined that the bid was conducted in accordance with Administrative Directive 4-05 and that reasonable efforts were made to increase bid participation. This procurement meets the requirements for a single bid and represents a good value for the work to be performed.

 

A bid protest was filed by another vendor. Staff investigated this claim and found it to be unsubstantiated.

 

OWNER

 

Archer Western Construction, LLC

 

Daniel P. Walsh, President

 

MAP

 

Attached