File #: 22-1429    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 6/13/2022 In control: Water Utilities Department
On agenda: 8/10/2022 Final action:
Title: Authorize a professional services contract with Pacheco Koch Consulting Engineers, Inc. to provide engineering services for storm drainage relief and erosion control improvements at four locations (list attached to Agenda Information Sheet) - Not to exceed $221,579.00 - Financing: Storm Drainage Management Capital Construction Fund
Indexes: 3, 4
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     August 10, 2022

COUNCIL DISTRICT(S):                     3, 4

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Kimberly Bizor Tolbert

______________________________________________________________________

SUBJECT

 

Title

Authorize a professional services contract with Pacheco Koch Consulting Engineers, Inc. to provide engineering services for storm drainage relief and erosion control improvements at four locations (list attached to Agenda Information Sheet) - Not to exceed $221,579.00 - Financing: Storm Drainage Management Capital Construction Fund

 

Body

BACKGROUND

 

This action will authorize a professional services contract with Pacheco Koch Consulting Engineers, Inc. for the engineering evaluation and design of storm drainage and erosion control improvements at four locations. Dallas Water Utilities has identified various properties in the City of Dallas impacted by stream erosion and flooding. Engineering evaluations and design improvements will be completed under this contract for 2412 Kiest Boulevard, Cedar Creek Bridge at Clarendon Drive, Cedar Creek Bridge at Moore Street, and 3445, 3449, 3605, 3621 Holliday Road.

 

The services provided for this contract include project management, topographic and boundary surveys, easement document preparation, subsurface utility exploration, geotechnical investigations, structural analysis, drainage studies including hydrologic and hydraulic stream and storm drain system modeling, and development of conceptual and final construction plans and special specifications. Initial engineering services for Cedar Creek Bridge at Clarendon and Cedar Creek Bridge at Moore include a preliminary design report to determine potential drainage improvement alternatives. Once a preferred alternative is selected, a future supplemental agreement will need to be authorized to complete the design and prepare construction plans. The scope of work at 2412 Kiest Boulevard and 3445, 3449, 3605, 3621 Holliday Road includes an engineering study of stream bank erosion and full design of erosion control improvements, including construction documents to stabilize eroded stream banks. The estimated construction cost for improvements included in this contract is $7,931,621.00. 

 

The consulting firm for this project was selected following a qualifications-based selection process in accordance with City of Dallas Administrative Directive 4-05 procurement guidelines.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Services                     September 2022

Complete Services                     September 2025

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2022

FY 2023

Future Years

Storm Drainage Management Capital Construction Fund

$221,579.00

$0.00

$0.00

 

                     Council District                     Amount

 

                     3                     $  64,694.00

                     4                     $156,885.00

 

                     Total                     $221,579.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

M/WBE %

M/WBE $

$221,579.00

Architecture & Engineering

34.00%

45.59%

$101,025.00

This contract exceeds the M/WBE goal.

Pacheco Koch Consulting Engineers LLC- Local; Workforce - 32.50% Local

 

OWNER

 

Pacheco Koch Consulting Engineers, Inc.

 

D. Ryan Plasse, P.E., Director, Water Resources

 

MAPS

 

Attached