File #: 22-1659    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 7/25/2022 In control: Water Utilities Department
On agenda: 9/14/2022 Final action:
Title: Authorize (1) an increase in appropriations in an amount not to exceed $20,001,590.00 in the Water Construction Fund; and (2) a construction services contract for major maintenance and rehabilitation improvements at Dallas Water Utilities Water Treatment Plants - Archer Western Construction, LLC, only bidder - Not to exceed $25,427,590.00 - Financing: Water Construction Fund ($20,516,590.00) and Water Capital Improvement G Fund ($4,911,000.00)
Indexes: 200, 6
Attachments: 1. Maps, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     September 14, 2022

COUNCIL DISTRICT(S):                     6, Outside City Limits

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Kimberly Bizor Tolbert

______________________________________________________________________

SUBJECT

 

Title

Authorize (1) an increase in appropriations in an amount not to exceed $20,001,590.00 in the Water Construction Fund; and (2) a construction services contract for major maintenance and rehabilitation improvements at Dallas Water Utilities Water Treatment Plants - Archer Western Construction, LLC, only bidder - Not to exceed $25,427,590.00 - Financing: Water Construction Fund ($20,516,590.00) and Water Capital Improvement G Fund ($4,911,000.00)

 

Body

BACKGROUND

 

Dallas Water Utilities (DWU) provides water to approximately 2.6 million residents in the City of Dallas and neighboring communities. DWU operates three potable water treatment plants - Bachman, Elm Fork, and East Side. The combined treatment capacity of these facilities is approximately 900 million gallons per day.

 

On August 12, 2020, a professional services contract was awarded for the evaluation and design of high priority major maintenance improvements at each water treatment plant. The assessments were completed, and major maintenance improvements have been designed and advertised for bids. This action will authorize a construction contract to update existing equipment and address infrastructure needs at the three water treatment plants. At the Bachman Water Treatment Plant, improvements include the removal of two existing chemical storage tanks and the installation of two new 5,000-gallon fiberglass storage tanks, repair of the chemical containment area, expansion of emergency eyewash and shower tepid water system, and the replacement of 28 programmable logic controllers. At the East Side Water Treatment Plant, improvements include the installation of a new elevated water storage tank, chemical storage area and pump room improvements, replacement of existing polyvinyl chloride (PVC) lime slurry piping with stainless steel piping, and other various items. At the Elm Fork Water Treatment Plant, improvements include the replacement of primary sedimentation basin clarifier mechanism blades and squeegees, replacement of the emergency ammonia scrubber, and other various items.

 

 

As treatment facilities and associated equipment age, technology improves, regulatory requirements and operational conditions change, treatment facilities and equipment need to be rehabilitated or upgraded to ensure reliable and quality water service to DWU customers. The assessment of key facilities at each treatment plant has enabled DWU to prioritize and select maintenance projects to be completed. This project is the first Major Maintenance and Rehabilitation Project of an ongoing program to evaluate key facilities and schedule periodic major maintenance improvements at each of DWU’s water treatment plants.

 

The following chart illustrates Archer Western Construction, LLC’s contractual activities with the City of Dallas for the past three years:

 

                     PBW                     DWU                     PKR                     TRN

 

Projects Completed                     0                     4                     0                     0

Active Projects                     0                     2                     0                     0

Change Orders                     0                     3                     0                     0

Projects Requiring Liquidated Damages                     0                     0                     0                     0

Projects Completed by Bonding Company                     0                     0                     0                     0

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Construction                     November 2022

Complete Construction                     November 2024

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

This item has no prior action.

 

FISCAL INFORMATION

 

Fund

FY 2022

FY 2023

Future Years

Water Construction Fund

$20,516,590.00

$0.00

$0.00

Water Capital Improvement G Fund

$  4,911,000.00

$0.00

$0.00

Total

$25,427,590.00

$0.00

$0.00

 

                     Council District                     Amount

 

                     6                     $  2,906,375.54

                     Outside City Limits                     $22,521,214.46

 

                     Total                     $25,427,590.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

Contract Amount

Category

M/WBE Goal

M/WBE  Subcontracting %

M/WBE  Overall %

M/WBE Overall Participation $

$25,427,589.99

Construction

32.00%

32.13%

32.13%

$8,168,904.59

This contract exceeds the M/WBE participation

Archer Western Construction LLC, Local; Workforce - .079% Local

 

PROCUREMENT INFORMATION

 

The following single bid with quotes was received and opened on June 3, 2022:

 

*Denotes only bidder

 

Bidder                     Bid Amount

 

*Archer Western Construction, LLC                      $25,427,590.00

  1411 Greenway Drive

  Irving, Texas 75038

 

Note: Dallas Water Utilities has reviewed this procurement and determined that the bid was conducted in accordance with Administrative Directive 4-05 and that reasonable efforts were made to increase bid participation. This procurement meets the requirements for a single bid and represents a good value for the work to be performed.

 

OWNER

 

Archer Western Construction, LLC

 

Daniel P. Walsh, President

 

MAPS

 

Attached