Dallas Logo
File #: 22-2033    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 9/6/2022 In control: Water Utilities Department
On agenda: 10/26/2022 Final action:
Title: Authorize an increase in the construction services contract with Douglas Dailey Construction, LLC, for additional pavement restoration associated with the installation of water and wastewater mains at 26 locations (list attached to the Agenda Information Sheet) - Not to exceed $1,962,835.00, from $11,941,371.00 to $13,904,206.00 - Financing: Wastewater (Clean Water) - 2022 TWDB Fund ($490,709.00) and Water (Drinking Water) - 2022 TWDB Fund ($1,472,126.00)
Indexes: 1, 10, 13, 14, 2, 4, 5, 6, 7, 8, 9
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Transportation & Infrastructure
AGENDA DATE: October 26, 2022
COUNCIL DISTRICT(S): 1, 2, 4, 5, 6, 7, 8, 9, 10, 13, 14
DEPARTMENT: Water Utilities Department
EXECUTIVE: Kimberly Bizor Tolbert
______________________________________________________________________
SUBJECT

Title
Authorize an increase in the construction services contract with Douglas Dailey Construction, LLC, for additional pavement restoration associated with the installation of water and wastewater mains at 26 locations (list attached to the Agenda Information Sheet) - Not to exceed $1,962,835.00, from $11,941,371.00 to $13,904,206.00 - Financing: Wastewater (Clean Water) - 2022 TWDB Fund ($490,709.00) and Water (Drinking Water) - 2022 TWDB Fund ($1,472,126.00)

Body
BACKGROUND

On June 24, 2020, City Council authorized a construction contract with Douglas Dailey Construction, LLC for the installation of water and wastewater mains at 26 locations by Resolution No. 20-1023. During construction of the mains, unforeseen site conditions were encountered that require additional paving. In several locations, the road base is thicker than anticipated, requiring more concrete base material and asphalt than originally quantified for the project. At other locations, additional sidewalk and driveway repairs are needed based on excavation limits and the extent of paving repairs must be increased beyond the anticipated width to restore the street to a condition that meets the requirements of the City of Dallas Pavement Cut and Repair Standards. In addition, some locations require additional quick curing concrete to open pavement to traffic sooner.

This action will authorize a change order for the additional paving necessary to restore street, sidewalk, and driveway surfaces impacted by construction. Approval of the change order will allow Dallas Water Utilities to finish paving restoration and ensure the scope and quality of repairs are compliant with City of Dallas standards. Any delay ...