Dallas Logo
File #: 22-1863    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 8/16/2022 In control: Water Utilities Department
On agenda: 11/9/2022 Final action:
Title: Authorize Supplemental Agreement No. 1 to the professional services contract with Gresham Smith to provide additional engineering services for the Lower East Bank Interceptor - Not to exceed $347,510.00, from $2,180,474.50 to $2,527,984.50 - Financing: Wastewater Capital Improvement F Fund
Indexes: 6
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Transportation & Infrastructure

AGENDA DATE:                     November 9, 2022

COUNCIL DISTRICT(S):                     6

DEPARTMENT:                     Water Utilities Department

EXECUTIVE:                     Kimberly Bizor Tolbert

______________________________________________________________________

SUBJECT

 

Title

Authorize Supplemental Agreement No. 1 to the professional services contract with Gresham Smith to provide additional engineering services for the Lower East Bank Interceptor - Not to exceed $347,510.00, from $2,180,474.50 to $2,527,984.50 - Financing: Wastewater Capital Improvement F Fund

 

Body

BACKGROUND

 

On December 14, 2016, City Council awarded a professional services contract to Gresham Smith for engineering design services related to the replacement and rehabilitation of water and wastewater mains at 13 locations. One of those locations included the replacement and rehabilitation of the existing Lower East Bank wastewater interceptor system that is in poor structural condition and needs additional capacity to support ongoing and future development. The Lower East Bank Interceptor has been identified in master planning efforts as one of Dallas Water Utilities’ (DWU) most critical pipeline improvement projects.

 

Design improvements for the Lower East Bank Interceptor were completed and the project was put on-hold until the necessary easements for the project could be acquired. Following the completion of design and prior to the advertisement for construction bids, DWU completed an updated master plan that recommended an increase to the wastewater flows to be conveyed by the Lower East Bank Interceptor. The increased flows required the Lower East Bank Interceptor design to be modified before advertising for construction bids. On September 23, 2020, a construction contract was awarded and following award of the contract it was determined that the bottom of an existing pressure storm sewer conflicted with the proposed alignment of the interceptor. The existing pressure sewer has a bottom elevation different than what was originally anticipated based on the best available records and a portion of the interceptor design was modified to clear the conflict.

 

 

 

 

This action will authorize a supplemental agreement for additional engineering services necessary to complete the Lower East Bank Interceptor Project. Supplemental Agreement No. 1 will fund the previous design modifications and allow for the remaining funds to be used for construction phase services. The project is currently under construction and anticipated to be completed in 2024.

 

ESTIMATED SCHEDULE OF PROJECT

 

Begin Services                                           November 2022

Complete Services                                           March 2024

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On December 14, 2016, City Council authorized engineering services contracts with four consulting firms to provide design services for the replacement and rehabilitation of water and wastewater mains at 109 locations by Resolution No. 16-1946.

 

FISCAL INFORMATION

 

Fund

FY 2023

FY 2024

Future Years

Wastewater Capital Improvement F Fund

$347,510.00

$0.00

$0.00

 

Design                                                                                                                               $2,180,474.50

Supplemental Agreement No. 1 (this action)      $   347,510.00

Project Total                                                                                                                              $2,527,984.50

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$347,510.00

Architecture & Engineering

25.00%*

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

25.90%

25.90%

$90,000.00

*This item reflects previous Business Inclusion and Development M/WBE Policy.

This contract exceeds the M/WBE goal.

Supplemental Agreement No. 1 - 29.16% Overall M/WBE participation

Gresham Smith - Local; Workforce - 36.00% Local

 

 

 

 

 

OWNER

 

Gresham Smith

 

Rodney Chester, P.E., Chief Executive Officer

 

MAP

 

Attached