STRATEGIC PRIORITY: Quality of Life, Arts & Culture
AGENDA DATE: January 25, 2023
COUNCIL DISTRICT(S):|910|DEPARTMENT: Park & Recreation Department
EXECUTIVE: John D. Jenkins
______________________________________________________________________
SUBJECT
Title
Authorize an increase in the construction services contract with The Fain Group, Inc. for additional work at the Phase 2 Project at Bachman Regional Aquatic Center located at 2750 Bachman Drive - Not to exceed $622,654.90, from $7,454,303.55 to $8,076,958.45 - Financing: Capital Gifts, Donations and Development Fund
Body
BACKGROUND
This action will authorize Change Order No. 4 to the construction services contract with The Fain Group, Inc. The original scope of work included the construction of a regional aquatic facility including a bathhouse, four lane lap pool, kids play pool, lazy river, two slides, shade structures and landscaping. The changes addressed with this change order are necessary due to increases in material costs, the requirement to bore for utilities under trees, additional tree protection, tree root air spading, additional plumbing for aquatic chair lifts, ornamental security fencing at the recreation center and additional structural steel required for constructability.
This change order scope includes: added material costs for ornamental fencing, masonry, insulation, stainless steel fabrications, concrete, steel stud framing, and wood framing; rerouting and boring of a storm water line under post oak trees; boring for a water supply line, pool deck drainage and electrical line; additional tree protection fencing for post oak trees, post oak tree root air spading for root pruning at excavations and Storm Water Pollution Prevention Plan (SWPPP) fencing, expanded Storm Water Pollution Prevention Plan (SWPPP) fencing around the construction site, additional plumbing for two hydraulically powered chair lifts at the lap pool and lazy river, replacement of 484 linear feet of ornamental fe...
Click here for full text