File #: 23-1048    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 4/7/2023 In control: Department of Transportation
On agenda: 5/24/2023 Final action:
Title: Authorize (1) the acceptance of a grant from the United States Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Surface Transportation Block Grant Program (Agreement No. CSJ 0918-47-390, CFDA No. 20.205) as Federal share in the total project cost of $2,406,614.00, which includes $1,840,000.00 as Federal participation for environmental assessment, engineering, construction, and direct state costs, $106,614.00 as State participation for indirect state costs, and $460,000.00 as local participation for environmental assessment, engineering, construction, and direct state costs paid to TxDOT prior to construction for cost related to the preparation of preliminary engineering (schematic and environmental), final design, plans, specifications and estimates, and the reconstruction of Lake June Road from U.S. 175 to Gillette Street including rehabilitation of a 6 to 4 lane roadway including full depth pavement repair to i...
Indexes: 5
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Transportation & Infrastructure
AGENDA DATE: May 24, 2023
COUNCIL DISTRICT(S):|910|DEPARTMENT: Department of Transportation
EXECUTIVE: Dr. Robert Perez
______________________________________________________________________
SUBJECT

title
Authorize (1) the acceptance of a grant from the United States Department of Transportation Federal Highway Administration through the Texas Department of Transportation (TxDOT) for the Surface Transportation Block Grant Program (Agreement No. CSJ 0918-47-390, CFDA No. 20.205) as Federal share in the total project cost of $2,406,614.00, which includes $1,840,000.00 as Federal participation for environmental assessment, engineering, construction, and direct state costs, $106,614.00 as State participation for indirect state costs, and $460,000.00 as local participation for environmental assessment, engineering, construction, and direct state costs paid to TxDOT prior to construction for cost related to the preparation of preliminary engineering (schematic and environmental), final design, plans, specifications and estimates, and the reconstruction of Lake June Road from U.S. 175 to Gillette Street including rehabilitation of a 6 to 4 lane roadway including full depth pavement repair to include bike lanes, sidewalks, lighting, and traffic signal at Gillette Street and Lake June Road; (2) a local match in the amount of $460,000.00; (3) the disbursement of funds in the amount of $460,000.00 to TxDOT from the Coronavirus State and Local Fiscal Recovery Fund; and (4) execution of the Advance Funding Agreement with TxDOT and all terms, conditions, and documents required by the grant agreement - Total amount of $460,000.00 - Financing: Coronavirus State and Local Fiscal Recovery Fund

body
BACKGROUND

The Texas Transportation Commission passed Minute Order No. 116292 authorizing the State to undertake and complete a highway improvement or other transportation project generally described as rehabilitation of Lake June...

Click here for full text