File #: 23-2077    Version: 1 Name:
Type: ITEMS FOR INDIVIDUAL CONSIDERATION Status: Agenda Ready
File created: 8/7/2023 In control: Department of Aviation
On agenda: 9/27/2023 Final action:
Title: Authorize (1) an increase in appropriations in an amount not to exceed $29,115,539.00 in the Aviation Passenger Facility Charge - Near Term Projects Fund; (2) a reduction in appropriations in an amount not to exceed $16,405,836.00 in the Aviation Commercial Paper Fund; and (3) a construction services contract to provide construction services for the Runway 13L-31R Runway Safety Area Improvements and Rehabilitate Taxiway A Project at Dallas Love Field - Flatiron Constructors, Inc., only bidder - Not to exceed $60,973,000.00 - Financing: Aviation Passenger Facility Charge - Near Term Projects Fund ($28,894,625.00) and FAA FY23 Grant Fund ($32,078,375.00)
Indexes: 2
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Transportation & Infrastructure
AGENDA DATE: September 27, 2023
COUNCIL DISTRICT(S):|910|DEPARTMENT: Department of Aviation
EXECUTIVE: Kimberly Bizor Tolbert
______________________________________________________________________
SUBJECT

Title
Authorize (1) an increase in appropriations in an amount not to exceed $29,115,539.00 in the Aviation Passenger Facility Charge - Near Term Projects Fund; (2) a reduction in appropriations in an amount not to exceed $16,405,836.00 in the Aviation Commercial Paper Fund; and (3) a construction services contract to provide construction services for the Runway 13L-31R Runway Safety Area Improvements and Rehabilitate Taxiway A Project at Dallas Love Field - Flatiron Constructors, Inc., only bidder - Not to exceed $60,973,000.00 - Financing: Aviation Passenger Facility Charge - Near Term Projects Fund ($28,894,625.00) and FAA FY23 Grant Fund ($32,078,375.00)

Body
BACKGROUND

Dallas Love Field has developed a Five-Year Airside Capital Improvement Program. This program is based on the results of the Love Field Pavement Evaluation Study performed in 2017 and on the requirements of the Federal Aviation Administration (FAA), which showed that all existing taxiways and connectors located on the west side of the terminal are reaching the end of their useful life. In addition, it is necessary to reconfigure and reconstruct the taxiways and connectors to conform to current FAA safety standards.

Garver, LLC provided design documents and will be providing construction administration services for the Runway 13L-31R Runway Safety Area (RSA) Improvements and Rehabilitate Taxiway A Project at Dallas Love Field. During the design, the Department of Aviation coordinated an agreement with the FAA to provide financial grants to be used to assist in the necessary improvements of the Runway 13L-31R RSA Improvements and Rehabilitate Taxiway A Project.

This action will authorize a construction services contract with Flatiron C...