File #: 24-718    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 2/21/2024 In control: Park & Recreation Department
On agenda: 3/27/2024 Final action:
Title: Authorize a Supplemental Agreement No. 1 to the professional services contract with Metropolitan Infrastructure, PLLC for engineering design services that include developing a full hydraulic study and hydrologic modeling to comply with floodplain management permitting requirements along the White Rock Creek Branch and Williamson Branch Tributary at Lakewood Park located at 7143 Williamson Road - Not to exceed $30,605.00, from $78,575.00 to $109,180.00 - Financing: Park and Recreation Facilities (B) Funds (2017 General Obligation Bond Funds)
Indexes: 9
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

STRATEGIC PRIORITY:                     Quality of Life, Arts & Culture

AGENDA DATE:                     March 27, 2024

COUNCIL DISTRICT(S):                     9

DEPARTMENT:                     Park & Recreation Department

EXECUTIVE:                     John D. Jenkins

______________________________________________________________________

SUBJECT

 

Title

Authorize a Supplemental Agreement No. 1 to the professional services contract with Metropolitan Infrastructure, PLLC for engineering design services that include developing a full hydraulic study and hydrologic modeling to comply with floodplain management permitting requirements along the White Rock Creek Branch and Williamson Branch Tributary at Lakewood Park located at 7143 Williamson Road - Not to exceed $30,605.00, from $78,575.00 to $109,180.00 - Financing: Park and Recreation Facilities (B) Funds (2017 General Obligation Bond Funds)

 

Body

BACKGROUND

 

On August 11, 2021, the City Council authorized a professional services contract with Metropolitan Infrastructure, PLLC, for conceptual design and surveying services of Lakewood Park design of a steel pedestrian bridge across White Rock Creek Branch with concrete trail and sidewalk connections, near the 7143 block of Williamson Road, in an amount not to exceed $78,575.00, by Resolution No. 21-1266.

 

This action will authorize Supplemental Agreement No. 1 to the professional services contract with Metropolitan Infrastructure, PLLC to provide for the design of a full Hydrologic Engineering Center - River Analysis System (HEC-RAS) Study, hydraulic modeling and hydrologic drainage report of the project site’s White Rock Creek Branch and Williamson Branch Tributaries necessary to comply with Dallas Water Utilities floodplain management engineering criteria and permitting requirements.

 

ESTIMATED SCHEDULE OF PROJECT

 

Began Design                                          November 2023

Completed Design                                          February 2023

Begin Design                                                               June 2024

Complete Construction                     November 2024

 

 

PRIOR ACTION/REVIEW (COUNCIL, BOARDS, COMMISSIONS)

 

On August 11, 2021, the City Council authorized a Professional Services contract with Metropolitan Infrastructure, PLLC, for conceptual design and surveying services of Lakewood Park design of a steel pedestrian bridge across White Rock Creek Branch with concrete trail and sidewalk connections, near the 7143 block of Williamson Road by Resolution No. 21-1266.

 

On March 7, 2024, the Park and Recreation Board will consider authorizing a Supplemental Agreement No. 1 to the professional services contract with Metropolitan Infrastructure, PLLC for engineering design services that include developing a full hydraulic study and hydrologic modeling to comply with floodplain management permitting requirements along the White Rock Creek Branch and Williamson Branch Tributary at Lakewood Park located at 7143 Williamson Road.

 

FISCAL INFORMATION

 

Fund

FY 2024

FY 2025

Future Years

Park and Recreation Facilities (B) Fund

$30,605.00

$0.00

$0.00

 

Design Contract                                                              $  78,575.00

Supplemental Agreement No.1 (this action)                     $  30,605.00

 

              Total                                                                  $109,180.00

 

Estimated Future Construction Cost - $300,000.00

 

M/WBE INFORMATION

 

In accordance with the City’s Business Inclusion and Development Policy adopted on September 23, 2020, by Resolution No. 20-1430, as amended, the M/WBE participation on this contract is as follows:

 

Contract Amount

Procurement Category

M/WBE Goal

$30,605.00

Professional Services

38.00%

M/WBE Subcontracting %

M/WBE Overall %

M/WBE Overall Participation $

33.98%

100.00%

$30,605.00

This contract does not meet the M/WBE goal.

Metropolitan Infrastructure, PLLC - Local; Workforce - 10.00% Local

 

OWNER

 

Metropolitan Infrastructure, PLLC

1413 East IH 30, Suite #3

Garland, TX 75043

 

Louis Frisbie, P.E.

 

MAP

 

Attached