File #: 24-771    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 11/30/2023 In control: Water Utilities Department
On agenda: 4/10/2024 Final action:
Title: Authorize (1) a professional services contract with Gresham Smith to provide engineering services for storm drainage system and erosion control improvements at three locations (list attached to the Agenda Information Sheet); and (2) an increase in appropriations in an amount not to exceed $818,949.25 in 2024 Certificate of Obligation Fund - Not to exceed $818,949.25 - Financing: 2024 Certificate of Obligation Fund (subject to annual appropriations)
Indexes: 13, 2
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Transportation & Infrastructure
AGENDA DATE: April 10, 2024
COUNCIL DISTRICT(S): 2, 6, 9, 13
DEPARTMENT: Water Utilities Department
EXECUTIVE: Kimberly Bizor Tolbert
______________________________________________________________________
SUBJECT

Title
Authorize (1) a professional services contract with Gresham Smith to provide engineering services for storm drainage system and erosion control improvements at three locations (list attached to the Agenda Information Sheet); and (2) an increase in appropriations in an amount not to exceed $818,949.25 in 2024 Certificate of Obligation Fund - Not to exceed $818,949.25 - Financing: 2024 Certificate of Obligation Fund (subject to annual appropriations)

Body
BACKGROUND

This action will authorize a professional services contract with Gresham Smith for the engineering evaluation and design of storm drainage and erosion control improvements at three locations. Dallas Water Utilities has identified various properties in the City of Dallas impacted by stream erosion and flooding. Engineering evaluations and design improvements will be completed under this contract for Ash Creek stream bank stabilization at 1519 Kiltartan and to address flooding issues attributed to existing inadequate storm drainage infrastructure at two locations. Those locations include the alley just north of 4209 Rosa Court and the Highgrove Area from Clover Lane to Northwest Highway between Lakemont and Folkstone.

Engineering services for 1519 Kiltartan along Ash Creek include an evaluation, preliminary and final design drawings for approximately 70 feet of erosion control, project management, survey, easement document preparation, tree mitigation, subsurface utility exploration, and geotechnical investigations. The scope of work for the alley just north of 4209 Rosa Court includes designing additional inlets at the alley just north of 4209 Rosa Court to provide drainage relief and evaluation of a new storm drainage line parallel...