Dallas Logo
File #: 24-627    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 2/13/2024 In control: Water Utilities Department
On agenda: 4/10/2024 Final action:
Title: Authorize an increase in the construction services contract with Douglas Dailey Construction, LLC for additional work associated with the installation of water services, large valve manholes, dewatering efforts for construction, and additional paving and surface restoration work - Not to exceed $750,410.00, from $13,921,735.00 to $14,672,145.00 - Financing: Water Capital Improvement F Funds ($558,035.00) and Wastewater Capital Improvement F Funds ($192,375.00)
Indexes: 1, 6
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Transportation & Infrastructure
AGENDA DATE: April 10, 2024
COUNCIL DISTRICT(S): 1, 6
DEPARTMENT: Water Utilities Department
EXECUTIVE: Kimberly Bizor Tolbert
______________________________________________________________________
SUBJECT

Title
Authorize an increase in the construction services contract with Douglas Dailey Construction, LLC for additional work associated with the installation of water services, large valve manholes, dewatering efforts for construction, and additional paving and surface restoration work - Not to exceed $750,410.00, from $13,921,735.00 to $14,672,145.00 - Financing: Water Capital Improvement F Funds ($558,035.00) and Wastewater Capital Improvement F Funds ($192,375.00)

Body
BACKGROUND

On May 25, 2022, the City Council authorized a construction services contract for the replacement and rehabilitation of approximately 27,884 feet of water and wastewater mains at 13 locations by Resolution No. 22-0816. During construction at Luna Road from Northwest Highway (Loop 12) to Royal Lane, Dallas Water Utilities (DWU) encountered unforeseen site, soil, groundwater, and vegetation conditions requiring extensive dewatering efforts; determined the need for additional water service installations at locations where previously unidentified existing water meters were exposed during construction; and made design modifications to include large valve manholes for future access improvements. At another location on Jefferson Boulevard from Ravinia Drive northeast, it was also determined that additional concrete curb and gutter replacement and pavement extension was necessary. Available funding under the original contract will not be adequate to address the additional work.

This action will authorize Change Order No. 1 to the construction services contract with Douglas Dailey Construction, LLC for additional funding needed to complete the ongoing installation of the water and wastewater improvements at Luna Road and Jefferson Boul...

Click here for full text