Dallas Logo
Please note: this meeting's minutes have not been finalized yet. Actions taken on legislation and their results are not available.
Meeting Name: Transportation and Infrastructure Committee Agenda status: Final
Meeting date/time: 1/21/2025 1:00 PM Minutes status: Draft  
Meeting location: COUNCIL CHAMBERS, CITY HALL bit.ly/cityofdallastv
Published agenda: Agenda Agenda  
Attachments: January 21, 2024 Agenda TRNI
File #Ver.Agenda #NameTypeTitleActionResultVideo
25-252A 1A BRIEFING ITEMSApproval of the December 3, 2024 Transportation and Infrastructure Committee Meeting   Not available
25-254A 1B BRIEFING ITEMSDallas Bike Plan 2025: Status Update [Ghassan Khankarli, Ph.D., P.E., Director, Department of Transportation & Public Works]   Not available
25-255A 1C BRIEFING ITEMSSummary of High-Speed Rail Trip to Japan November 2024 [Dev Rastogi, Assistant City Manager, City Manager’s Office] [Molly Carroll, Transportation Interagency Liaison, Department of Transportation & Public Works]   Not available
25-258A 1E BRIEFING ITEMSCommittee Forecast   Not available
25-275A 1D BRIEFING ITEMSApprove Amendments to Chapter 3, Article III of the DFW International Airport Code of Rules and Regulations [Paul Tomme, Legal Counsel, Dallas Fort Worth International Airport]   Not available
25-259A 1F BRIEFING ITEMSDallas Water Utilities: An ordinance amending Chapter 49, “Water and Wastewater”, of the Dallas City Code (1) by amending Section 49 43; (2) amending the uniform concentration limits for wastewater discharged at certain treatment plants; (3) providing a penalty not to exceed $2,000.00 providing a saving clause; (4) providing a severability clause; and (5) providing an effective date Financing: This action has no cost consideration to the City (see Fiscal Information)   Not available
25-260A 1G BRIEFING ITEMSDallas Water Utilities: Authorize acquisition of a drainage easement containing approximately 865 square feet of land from Johnie Wilson and wife Mary B. Wilson, located at Fernwood Avenue near its intersection with Louisiana Avenue for the Kings Branch Culvert at Louisiana Project - Not to exceed $7,500.00 ($4,500.00, plus closing costs and title expenses not to exceed $3,000.00) - Financing: Flood Control (D) Fund (2017 General Obligation Bond Fund)   Not available
25-261A 1H BRIEFING ITEMSDallas Water Utilities: Authorize the second step of acquisition for condemnation by eminent domain to acquire a drainage easement containing approximately 3,644 square feet of land from A.J. Wallace and wife, Marilyn Wallace, located at East Woodin Boulevard near its intersection with Fernwood Avenue for the Kings Branch Culvert at Woodin Project Not to exceed $13,700.00 ($10,700.00, plus closing costs and title expenses not to exceed $3,000.00) Financing: 2024 Certificate of Obligation Fund   Not available
25-262A 1I BRIEFING ITEMSDepartment of Aviation: Authorize (1) the rejection of all bids received for solicitation CIZ24 AVI 3112 for construction services for the Dallas Executive Airport Streetscape Enhancements Project; and (2) the re advertisement of the solicitation for construction services for the Dallas Executive Airport Streetscape Enhancements Project for new bids Financing: No cost consideration to the City   Not available
25-263A 1K BRIEFING ITEMSDepartment of Aviation: Authorize an engineering services contract with Garver, LLC to design the expansion of airside ramp space from existing pavement to Taxiway Apron at Dallas Executive Airport Not to exceed $223,950.00 Financing: Aviation Construction Fund   Not available
25-276A 1J ITEMS FOR INDIVIDUAL CONSIDERATIONDepartment of Aviation: Authorize (1) the execution of an Airport Project Participation Agreement with the Texas Department of Transportation (Project No. 25ALDALAS) and all terms, conditions, and documents required by the agreement for implementation of the Airport Layout Plan Update and drainage study narrative at Dallas Executive Airport; and (2) the City of Dallas to match 5 percent ($40,158.00) of the estimated total project cost of $803,157.00 upon receipt of grant funds - Not to exceed $40,158.00 - Financing: Aviation Fund - Financing: Aviation Fund   Not available
25-265A 1L BRIEFING ITEMSDepartment of Aviation: Authorize Supplemental Agreement No. 1 to the cooperative purchasing agreement with GTS Technology Solutions, Inc. to exercise the first of two, three year renewal options for the continued purchase of firewalls and equipment, related accessories, managed services, and support services for the Department of Aviation, originally procured through the State of Texas Department of Information Resources interlocal agreement Not to exceed $769,922.51, from $658,939.00 to $1,428,861.51 Financing: Aviation Fund (subject to annual appropriations)   Not available
25-268A 1M BRIEFING ITEMSDepartment of Transportation & Public Works: Authorize a professional engineering services contract with LJA Engineering, Inc., most highly qualified proposer of two, to develop preliminary engineering (design schematic, right-of-way, environmental documents, and public involvement), plans, specifications, and estimates for the construction of new sidewalks, Americans with Disabilities Act ramps, curb extensions, pedestrian lighting, and upgrades to traffic signals from Live Oak Street to the north, Hall Street to the east, Interstate Highway 30 to the south, and Cesar Chavez Boulevard to the west in the city of Dallas for CSJ 0918-47-362 - Not to exceed $412,860.00 - Financing: Deep Ellum Area PEDS & Traffic Signal Fund ($392,000.00) and Street and Transportation (A) Fund (2017 General Obligation Bond Fund) ($20,860.00)   Not available
25-269A 1N BRIEFING ITEMSDepartment of Transportation & Public Works: Authorize the (1) acceptance of a grant from the U.S. Department of Housing and Urban Design (HUD) for the FY 2023 Economic Development Initiative Community Project Funding (Grant No. B 23 CP TX 1428, Assistance Listing No. 14.251) in the amount of $2,000,000.00 to support planning studies in Downtown Dallas and surrounding neighborhoods from the effective date of award through August 31, 2031; (2) receipt and deposit of funds in an amount not to exceed $2,000,000.00 in the Greater Downtown Dallas Master Plan FY23 EDI CPF Fund; (3) establishment of appropriations in an amount not to exceed $2,000,000.00 in the Greater Downtown Dallas Master Plan FY23 EDI CPF Fund; and (4) execution of the grant agreement with HUD and all terms, conditions, and documents required by the agreement Not to exceed $2,000,000.00 Financing: Greater Downtown Dallas Master Plan FY23 EDI CPF Fund   Not available
25-270A 1P BRIEFING ITEMSDepartment of Transportation & Public Works: Authorize the City Manager to provide the Notice of Intent to establish Quiet Zones along the Dallas Area Rapid Transit’s Silver Line corridor (formerly known as the Cotton Belt Line) encompassing 11 railroad crossings on the following streets: East Belt Line Road, Dallas Parkway Southbound, Dallas Parkway Northbound, Knoll Trail Drive, Davenport Road East/West, Campbell Road, Davenport Road North/South, McCallum Boulevard, Meandering Way, Dickerson Street, and a crossing at the future Copenhagen Avenue in the Cypress Waters Development as provided for in the Federal Railroad Administration’s Final Train Horn Rule Financing: No cost consideration to the City   Not available
25-274A 1O BRIEFING ITEMSDepartment of Transportation & Public Works: Authorize an Advance Funding Agreement with the Texas Department of Transportation (TxDOT) in the amount of $5,342,996.93 for a U.S. Department of Transportation Federal Highway Administration 2022 Highway Safety Improvement Program grant (Agreement No. CSJ 0048-01-070, etc., Assistance Listing No. 20.205) in the amount of $4,132,270.70 as Federal participation for construction, $498,541.53 as State participation for construction and indirect state costs, and $712,184.70 ($412,182.70 for direct state costs paid to TxDOT and an estimated $300,002.00 for design) plus any cost overruns as local participation to construct traffic signal improvements at six intersections (list attached to Agenda Information Sheet) - Total amount of $412,182.70 - Financing: General Fund   Not available
25-271A 1Q BRIEFING ITEMSDepartment of Transportation & Public Works: Authorize Supplemental Agreement No. 3 to the professional engineering services contract with Criado & Associates, LLC, formerly known as Criado & Associates, Inc., to (1) provide additional design services for Phase II of the project covering paving, drainage, water, and wastewater to accommodate a shared use path and intersection improvements along Ross Avenue between Greenville Avenue and Interstate Highway 345; and (2) extend the contract term by two years, for the period March 31, 2025 through March 31, 2027 Not to exceed $1,464,419.92, from $806,344.44 to $2,270,764.36 Financing: Water Capital Improvement G Fund ($196,899.00), Wastewater Capital Improvement G Fund ($196,899.00), Street and Transportation (A) Fund (2017 General Obligation Bond Fund) ($700,000.00), and General Fund ($370,621.92)   Not available
25-266A 1R BRIEFING ITEMSDepartment of Transportation & Public Works: Authorize (1) Amendment No. 1 to the Advance Funding Agreement (Agreement No. CSJ 0918 47 484, Assistance Listing No. 20.205) between the City of Dallas and the Texas Department of Transportation for engineering to reconstruct the intersection at Harry Hines Boulevard and Mockingbird Lane in the city of Dallas to revise (a) Article 1 to add the construction phase of the project; (b) Article 3 to add construction to the scope of work description; and (c) Attachment B to amend the funding participation; (2) the receipt and deposit of funds in the amount of $24,780,000.00 in the FY24 TxDOT Surface Transportation Block Grant Program Fund; and (3) an increase in appropriations in the amount of $24,780,000.00, from $2,940,000.00 to $27,720,000.00, in the FY24 TxDOT Surface Transportation Block Grant Program Fund Total amount of $24,780,000.00 Financing: FY24 TxDOT Surface Transportation Block Grant Program Fund   Not available