File #: 23-1979    Version: 1 Name:
Type: CONSENT AGENDA Status: Agenda Ready
File created: 7/25/2023 In control: Water Utilities Department
On agenda: 10/11/2023 Final action:
Title: Authorize a construction services contract for roof maintenance and roof emergency on-call repair service at all Water Department buildings located citywide and at Lake Ray Hubbard, Lake Fork and Lake Tawakoni - Texas Roof Management, Inc., lowest responsible bidder of two - Not to exceed $1,562,521.50 - Financing: Storm Drainage Management Fund ($68,252.25), Water Utilities Capital Improvement F Fund ($819,026.99), and Water Utilities Capital Improvement G Fund ($675,242.26)
Indexes: 1, 10, 11, 12, 14, 2, 200, 3, 4, 5, 6, 7, 8, 9
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Transportation & Infrastructure
AGENDA DATE: October 11, 2023
COUNCIL DISTRICT(S): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, Outside City Limits
DEPARTMENT: Water Utilities Department
EXECUTIVE: Kimberly Bizor Tolbert
______________________________________________________________________
SUBJECT

Title
Authorize a construction services contract for roof maintenance and roof emergency on-call repair service at all Water Department buildings located citywide and at Lake Ray Hubbard, Lake Fork and Lake Tawakoni - Texas Roof Management, Inc., lowest responsible bidder of two - Not to exceed $1,562,521.50 - Financing: Storm Drainage Management Fund ($68,252.25), Water Utilities Capital Improvement F Fund ($819,026.99), and Water Utilities Capital Improvement G Fund ($675,242.26)

Body
BACKGROUND

Dallas Water Utilities (DWU) consists of 320 structures with approximately 1.7 million square feet of roof systems that have an estimated replacement value of $20,400,000.00. DWU facilities are generally exposed to more aggressive and corrosive environments due to the chemicals used in some of the treatment processes. With this exposure roof materials break down at a higher rate, necessitating frequent repair and maintenance to properly manage these assets.

In 2019, a roof assessment was performed on all DWU buildings by Terracon Consultants, Inc. Working with Terracon, Consultants, Inc., the DWU Roof Maintenance manual and schedule was updated with current assessment information. The components include semi-annual physical roof inspections, minor repairs and debris removal at the time of inspection, and 24/7 emergency repair service that will continue the level of service that DWU has in place at this time.

This action will authorize semi-annual maintenance by manufacturer's certified technicians to protect and extend the life of the existing roofs and maintain manufacturer's warranties. This action will also provide minor repairs and 24/7 emerge...

Click here for full text