Title: Authorize a professional services contract with Garver, LLC to provide electrical engineering assessment of existing illumination levels and electrical systems, recommend improvements and design appropriate improvements as directed at Dallas Love Field and Dallas Airport Systems Vertiport - Not to exceed $245,000.00 - Financing: Aviation Construction Fund
Indexes: 2
Attachments: 1. Maps, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: September 25, 2019
COUNCIL DISTRICT(S):|910|DEPARTMENT: Department of Aviation
EXECUTIVE: Kimberly Bizor Tolbert
______________________________________________________________________
SUBJECT

Title
Authorize a professional services contract with Garver, LLC to provide electrical engineering assessment of existing illumination levels and electrical systems, recommend improvements and design appropriate improvements as directed at Dallas Love Field and Dallas Airport Systems Vertiport - Not to exceed $245,000.00 - Financing: Aviation Construction Fund

Body
BACKGROUND

Ramp lighting illuminates terminal ramp areas, which are used for loading and unloading aircraft, as well as airfield "remain-overnight" (RON) areas in which aircraft are parked and held until flight and gate logistics require movement of aircraft into service.

Dallas Love Field (DAL) Airside Operations and airline operations staff have identified several areas that require improved lighting levels, specifically DAL Terminal Gates 1 and 3. RON A, B, and C also need lighting improvements to create consistent levels of light for night-time maintenance operations.

At the Dallas Airport System Vertiport, perimeter and landing lights need to be assessed against current Federal Aviation Administration standards and layout revisions proposed as necessary. New fixtures will be light-emitting diode for better performance. A new windsock will be installed. The study will also assess existing electrical distribution systems to identify deficiencies, propose mitigation measures and design appropriate improvements as directed.

When existing conditions are documented and potential improvements are prioritized, a work plan will be developed with scope of work, project schedule, and project budget.

ESTIMATED SCHEDULE OF PROJECT

Begin Design October 2019
Complete Design May 2020
Begin Construction September 2020
Complete ...