Dallas Logo
File #: 20-1644    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 8/17/2020 In control: Water Utilities Department
On agenda: 11/11/2020 Final action: 11/11/2020
Title: Authorize Supplemental Agreement No. 1 to the professional services contract with Dannenbaum Engineering Company-Dallas, LLC to provide additional engineering services required for hydraulic modeling, preliminary design, and the development of construction plans and specifications for drainage improvements at two locations - Not to exceed $407,282.00, from $340,199.00 to $747,481.00 - Financing: Storm Drainage Management Capital Construction Fund ($394,782.00) and Water Capital Improvement D Fund ($12,500.00)
Indexes: 14, 2
Attachments: 1. Maps, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: November 11, 2020
COUNCIL DISTRICT(S): 2, 14
DEPARTMENT: Water Utilities Department
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

Title
Authorize Supplemental Agreement No. 1 to the professional services contract with Dannenbaum Engineering Company-Dallas, LLC to provide additional engineering services required for hydraulic modeling, preliminary design, and the development of construction plans and specifications for drainage improvements at two locations - Not to exceed $407,282.00, from $340,199.00 to $747,481.00 - Financing: Storm Drainage Management Capital Construction Fund ($394,782.00) and Water Capital Improvement D Fund ($12,500.00)

Body
BACKGROUND

On April 24, 2019, City Council authorized a professional services contract with Dannenbaum Engineering Company-Dallas, LLC for Storm Drainage Contract No. 4. Storm drainage system upgrades between Throckmorton Street and Knight Street were expected to relieve localized flooding and property damage and engineering services for these upgrades were included in the original contract. During the course of engineering evaluations, the consultant engineering firm determined that a large drainage area east of the Dallas North Tollway and outside the scope of the original contract was contributing significant overland runoff to the area. The area was found to have an undersized drainage system and improvements in the Throckmorton and Knight area alone would not address localized flooding.

In order to properly address localized flooding and property damage, it is necessary to upgrade existing storm sewer trunk lines, laterals, and inlets upstream of the target area. This action will authorize a supplemental agreement to the existing professional services contract for additional hydraulic modeling, preliminary design, and the development of construction plans and s...