Dallas Logo
File #: 20-1988    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 10/2/2020 In control: Water Utilities Department
On agenda: 12/9/2020 Final action: 12/9/2020
Title: Authorize a professional services contract with CDM Smith, Inc. to provide engineering services for the Water Delivery supervisory control and data acquisition and Meandering Way High Improvements - Not to exceed $2,530,000.00 - Financing: Water Construction Fund
Indexes: 100
Attachments: 1. Map, 2. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: December 9, 2020
COUNCIL DISTRICT(S): All
DEPARTMENT: Water Utilities Department
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

Title
Authorize a professional services contract with CDM Smith, Inc. to provide engineering services for the Water Delivery supervisory control and data acquisition and Meandering Way High Improvements - Not to exceed $2,530,000.00 - Financing: Water Construction Fund

Body
BACKGROUND

The City of Dallas Water Utilities (DWU) provides drinking water and fire flow protection to approximately 2.4 million people in the City of Dallas and 23 customer cities. DWU's water delivery system consists of 22 pump stations, 21 storage tanks, 18 pressure planes, and over 5,000 miles of pipeline infrastructure. A supervisory control and data acquisition (SCADA) system is used to operate and control the delivery of water.

This action will authorize an engineering services contract for the evaluation, preliminary design, development of construction plans and specifications, construction phase services, and start-up assistance for SCADA system and Meandering Way High pressure plane improvements. The existing SCADA system "top end" was originally installed in 2012, and has reached the end-of-support and is operating with expired warranties. Existing SCADA hardware and operating software will be evaluated and upgraded to support City of Dallas adopted technology frameworks and standards, to comply with Department of Homeland Security guidelines and recommendations, and to have flexibility to expand for future needs.

The Meandering Way High pressure plane is serviced by three pump stations (Meandering Way, Cosa Crest, and Parkway) and a single elevated tank (Highland Tank). Due to growth in the area, some parts of the Meandering Way High pressure plane experience lower water pressure and improvements have bee...

Click here for full text