Dallas Logo
File #: 20-1994    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 10/6/2020 In control: Water Utilities Department
On agenda: 12/9/2020 Final action: 12/9/2020
Title: Authorize Supplemental Agreement No. 1 to the professional services contract with AECOM Technical Services, Inc. to provide additional design, environmental permitting, development of construction plans, and construction administration services for erosion control structures at six locations (list attached to Agenda Information Sheet) - Not to exceed $97,606.00, from $232,422.39 to $330,028.39 - Financing: Storm Drainage Management Capital Construction Fund
Indexes: 1, 12, 3, 4
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Mobility Solutions, Infrastructure, and Sustainability
AGENDA DATE: December 9, 2020
COUNCIL DISTRICT(S): 1, 3, 4, 12
DEPARTMENT: Water Utilities Department
EXECUTIVE: Majed Al-Ghafry
______________________________________________________________________
SUBJECT

Title
Authorize Supplemental Agreement No. 1 to the professional services contract with AECOM Technical Services, Inc. to provide additional design, environmental permitting, development of construction plans, and construction administration services for erosion control structures at six locations (list attached to Agenda Information Sheet) - Not to exceed $97,606.00, from $232,422.39 to $330,028.39 - Financing: Storm Drainage Management Capital Construction Fund

Body
BACKGROUND

On April 10, 2019, City Council authorized a professional services contract with AECOM Technical Services, Inc. for the engineering evaluation and design of seven erosion control improvement projects. Erosion control improvements were evaluated for the Cedar Branch Culvert at Clarendon Drive, 2901 West Kiest Boulevard, 3918 Pyka Drive, 2200 Block of Five Mile Parkway, 408 Glen Oaks Boulevard, 412 and 416 Ohio Avenue, and 6431 Riverview Lane.

This action will authorize Supplemental Agreement No. 1 to finalize construction documents and permitting and provide construction phase services for six locations. Improvement designs were not recommended for 412 and 416 Glen Oaks Boulevard since the cost of required improvements exceed the value of the properties. The supplemental agreement will include design of erosion control improvements at 408 Glen Oaks Drive based on feasibility study recommendations in the original scope, design of additional gabion wall at 3918 Pyka Drive, additional design to protect existing headwalls being undermined at Clarendon Drive, additional environmental delineations at each site, and construction phase support for all sites.

This contract addresses erosion by developing constr...