File #: 22-662    Version: 1 Name:
Type: CONSENT AGENDA Status: Approved
File created: 3/3/2022 In control: Water Utilities Department
On agenda: 5/25/2022 Final action:
Title: Authorize (1) a construction services contract for the installation of erosion control improvements at 8 locations (list attached to the Agenda Information Sheet) and (2) an increase in appropriations in an amount not to exceed $1,316,901.00 in the Storm Drainage Management Capital Construction Fund - Austin Filter Systems, Inc., lowest responsible bidder of four - Not to exceed $5,886,800.00 - Financing: Storm Drainage Management Capital Construction Fund ($2,896,706.00), Flood Control (D) Fund (2017 General Obligation Bond Funds) ($2,525,019.00), Wastewater Capital Improvement G Fund ($328,075.00), and Street and Alley Improvement Fund ($137,000.00)
Indexes: 1, 10, 3, 4, 6, 8
Attachments: 1. List, 2. Maps, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
STRATEGIC PRIORITY: Transportation & Infrastructure
AGENDA DATE: May 25, 2022
COUNCIL DISTRICT(S): 1, 3, 4, 6, 8, 10
DEPARTMENT: Water Utilities Department
EXECUTIVE: Kimberly Bizor Tolbert
______________________________________________________________________
SUBJECT

Title
Authorize (1) a construction services contract for the installation of erosion control improvements at 8 locations (list attached to the Agenda Information Sheet) and (2) an increase in appropriations in an amount not to exceed $1,316,901.00 in the Storm Drainage Management Capital Construction Fund - Austin Filter Systems, Inc., lowest responsible bidder of four - Not to exceed $5,886,800.00 - Financing: Storm Drainage Management Capital Construction Fund ($2,896,706.00), Flood Control (D) Fund (2017 General Obligation Bond Funds) ($2,525,019.00), Wastewater Capital Improvement G Fund ($328,075.00), and Street and Alley Improvement Fund ($137,000.00)

Body
BACKGROUND

Dallas Water Utilities has identified 8 locations experiencing severe erosion where creek banks need to be stabilized to protect existing structures and critical infrastructure. Engineering solutions have been developed and construction plans and specifications were prepared and advertised for construction bids for these locations experiencing severe erosion.

This action will authorize a construction contract to implement engineering solutions to address critical erosion at these locations. The project improvements consist of the installation of gabion walls and gabion mattresses for erosion control at the following eight locations: Cedar Branch Culvert at West Clarendon Drive, 2625, 2641, 2663, 2667, 2687, and 2691 Deep Hill Circle, 3918 Pyka Drive, West Kiest Boulevard at Five Mile Creek, 408 Glen Oaks Boulevard, Joe's Creek Location No. 6 near Walnut Hill Lane and Bowman Boulevard, Bonnie View Road over Five Mile Creek, and 8903, 8907, and 8911 Club Creek Circle. At Bonnie View Road over Five Mile Creek work is also bei...

Click here for full text